Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m)
- Case study:Inchewan Burn Bed restoration + (Removal of artificial wire/stone bed)
- Case study:Agreed definition of mobility area for the Adour + (Removal of bank reinforcements)
- Case study:Isar-Plan + (Deepening of river floor)
- Case study:Ems floodplain + (Removal of bank reinforcements)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (Removal of bank reinforcements)
- Case study:Aaijen- Removal of bank fixation + (Removal of bank reinforcements)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Riverbank revegetation)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (Creation of gravel banks)
- Case study:Lower Woodsford + (Introducing large woody debris)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (Construction gravel bays)
- Case study:Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Removal of bank reinforcements)
- Case study:R Derwent Abutment & Buttress Removal + (Removal of bank reinforcements)
- Case study:Letting the Dove Flow 2 + (removing or breaching weirs and reinforcements)
- Case study:Restoring Brent Rivers and Communities + (Removal of bank reinforcements)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration of side channels)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (Lowering of checking valves)
- Case study:Cornmill Gardens (QUERCUS) + (Removal of concrete banks and bed)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (New bioengineering elements in order to stabilize slope banks)
- Case study:Upper Emscher + (Removal of concrete banks and bed)
- Case study:Doñana 2005 + (Removal of contaminated material)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Bank improvement)
- Case study:Clugston Burn (CASS) + (Removal of debris)
- Case study:Chiese river upstream Idro lake – Trentino region + (Removal of embankment separating Lora stream from Chiese river)
- Case study:QUERCUS Ravensbourne + (Removal of concrete banks and bed)
- Case study:Ladywell Fields (QUERCUS) + (Planting)
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration + (Removal of fish barriers)
- Case study:European Fisheries Fund + (Removal of fish barriers)
- Case study:Water Framework Directive Funding + (Removal of fish barriers)
- Case study:Lugg & Arrow, Radnorshire + (Removal of fish barriers)
- Case study:UP! - The Usk Project + (Removal of fish barriers)
- Case study:Habitat improvement measures in Bortneelva + (Removal of fish barriers)
- Case study:Habitat measures in Strynevassdraget + (Removal of fish barriers)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacement with wood structures)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Revetments with local species)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Revetmens with local species)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Removal of invasive plants)
- Case study:Friends of Afon Llwyd (FOAL) + (Removal of invasive plants)
- Case study:Saving Chiswick Eyot + (Bank stabilisation)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:South Esk restoration + (Removal of invasive species)
- Case study:River Kennet Restoration at Durnsford + (Regrading)
- Case study:River North Esk Maintenance + (Removal of invasive species)
- Case study:River Monnow (Going Native) + (Removal of invasive species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Dam removal)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles)
- Case study:Thur + (Removal of northern overbank)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds)