Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Beekherstel Willinkbeek + (Puinbestorting verwijderd)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:Bringing Back the Bulbourne + (Re-grading)
- Case study:River Skerne- Life project + (Re-grading and lowering)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Creation of gravel deflectors)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)
- Case study:Odder Stream Restoration + (Re-introducing spawning gravel)
- Case study:Restoration of the river Akerselva + (Habitat restoration)
- Case study:Deculverting Djupsund stream + (Re-introducing spawning gravel)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones)
- Case study:Restorations of Ritobäcken brook + (Adding sinuosity)
- Case study:Restoration of Kocksbybäcken brook + (Adding sinuosity)
- Case study:Restoration of Enningdalsälv River + (Building of submerged weirs and pits)
- Case study:Restoration of Ingarskilanjoki River + (Depth variation)
- Case study:River Glaven conservation group + (Re-profiling)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments)
- Case study:Logie Burn Restoration Project + (Re-profiling)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:River Darent at Hawley Manor + (Re-working of gravels to create riffles)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes)
- Case study:Long Preston Deeps Flood Plain Project + (Realignment of flood banks)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Morphological remodeling)
- Case study:Restoration project in Verde River + (Recess side slopes)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (Recess side slopes)
- Case study:La Gotera dam removal + (Dam removal)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Guadiamar Green Corridor Project + (Recovering connectivity longitudinal and transversal)
- Case study:Mayesbrook Climate Change Park restoration project + (Recovering connectivity longitudinal and transversal)
- Case study:Environmental restoration of the river Zújar + (Recovery of channel morphology)
- Case study:Day Brook Restoration - Gedling + (Channel reprofiling)
- Case study:Whit Beck River Restoration Project + (Improvement of natural flows)
- Case study:The Pentney Restoration Project + (Recovery of channel morphology)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (Marginal planting)
- Case study:Diffusing the Issue in rural Ribble + (Bank reprofiling)
- Case study:Taw River Improvement Project – Taw Access over Weirs + (Bank reprofiling)
- Case study:Upper Welland Water Friendly Farming Project + (Reduce diffuse pollution)
- Case study:River Wandle: Silt & SuDs + (Reduce diffuse pollution)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Bank reprofiling)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Bank reprofiling)
- Case study:Wye Herefordshire Improvement Project + (Bank reprofiling)
- Case study:Valtellina 2005 – New green system + (reforestation)
- Case study:Room for the River + (Removal of revetments)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope)
- Case study:Robledo de Chavela dam removal + (Dam removal)
- Case study:River Dee + (Planting)
- Case study:Vester Nebel Restoration + (Regrading)
- Case study:River Kennet Restoration at Durnsford + (Regrading)