Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Planting)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Barrier removal)
- Case study:River Quaggy- Chinbrook meadows + (Removal of revetments)
- Case study:Sutcliffe Park + (Planting of native species)
- Case study:River Somer channel enhancement, Midsomer Norton + (Weir removal)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Butter Hill Phase 2 + (Weir notched)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Creation and restoration of a riparian zone + (Pond creation)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Removal of a pond weir in a tributary of Petersbach + (Weir removal)
- Case study:Salzano wetland and Marzenego river restoration project + (Reshaping the net of canals)
- Case study:Pymmes Park Wetlands + (Deculverting)
- Case study:Firs Farm Wetlands + (Deculverting)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Bank stabilisation)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Providing of continuity)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Providing of continuity)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Beekherstel Willinkbeek + (Puinbestorting verwijderd)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:Bringing Back the Bulbourne + (Re-grading)
- Case study:River Skerne- Life project + (Re-grading and lowering)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Creation of gravel deflectors)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)
- Case study:Odder Stream Restoration + (Re-introducing spawning gravel)
- Case study:Restoration of the river Akerselva + (Habitat restoration)
- Case study:Deculverting Djupsund stream + (Re-introducing spawning gravel)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones)
- Case study:Restorations of Ritobäcken brook + (Adding sinuosity)
- Case study:Restoration of Kocksbybäcken brook + (Adding sinuosity)
- Case study:Restoration of Enningdalsälv River + (Building of submerged weirs and pits)
- Case study:Restoration of Ingarskilanjoki River + (Depth variation)
- Case study:River Glaven conservation group + (Re-profiling)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments)
- Case study:Logie Burn Restoration Project + (Re-profiling)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:River Darent at Hawley Manor + (Re-working of gravels to create riffles)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (Removal of lateral dikes)
- Case study:Long Preston Deeps Flood Plain Project + (Realignment of flood banks)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Morphological remodeling)
- Case study:Restoration project in Verde River + (Recess side slopes)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (Recess side slopes)