Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Dee + (Planting)
- Case study:Langford Lakes project + (Planting)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments)
- Case study:Ladywell Fields (QUERCUS) + (Planting)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:Meades water garden regeneration project + (Planting)
- Case study:Kleblach-Side channel + (Planting)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (Planting)
- Case study:River Avon Stream project + (Planting)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope)
- Case study:Rehabilitation of Benta stream + (Renewal of reventments)
- Case study:Highland Water at Warwickslade Lawn + (Planting)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Creation of gravel banks)
- Case study:Beddington Park + (Bank reprofiling)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Reopening of the culverted Redon river + (Reopening of culverted river)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration of side channels)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Planting)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (Planting of hydrophytes)
- Case study:River Quaggy- Chinbrook meadows + (Removal of revetments)
- Case study:Sutcliffe Park + (Planting of native species)
- Case study:River Somer channel enhancement, Midsomer Norton + (Weir removal)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Butter Hill Phase 2 + (Weir notched)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Planting of native species)
- Case study:LIFE Segura Riverlink (Through rivers) + (Planting of native species)
- Case study:Creation and restoration of a riparian zone + (Pond creation)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Removal of a pond weir in a tributary of Petersbach + (Weir removal)
- Case study:Salzano wetland and Marzenego river restoration project + (Reshaping the net of canals)
- Case study:Pymmes Park Wetlands + (Deculverting)
- Case study:Firs Farm Wetlands + (Deculverting)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (Bank stabilisation)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Providing of continuity)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Providing of continuity)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Beekherstel Willinkbeek + (Puinbestorting verwijderd)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:Bringing Back the Bulbourne + (Re-grading)
- Case study:River Skerne- Life project + (Re-grading and lowering)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Creation of gravel deflectors)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)