Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (Revetmens with local species)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (Revetmens with local species)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (New bioengineering elements in order to stabilize slope banks)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (New bioengineering elements in order to stabilize slope banks)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (New bioengineering elements in order to stabilize slope banks)
- Case study:Vallacuera Ravine. Removal of a dyke + (New bioengineering elements in order to stabilize slope banks)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (New bioengineering elements in order to stabilize slope banks)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of the river area of the section of Betzuca stream + (Landscape integration of the breakwater)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (New bioengineering elements in order to stabilize slope banks)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of a stretch of the river of Santa Coloma + (New bioengineering elements in order to stabilize slope banks)
- Case study:Environmental improvement project of the stream of Ruby + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of riparian zone in Aragon River + (New bioengineering elements in order to stabilize slope banks)
- Case study:Tolka Valley Park erosion control + (New bioengineering elements in order to stabilize slope banks)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (New outflow and inflow from ecoremediation system)
- Case study:HPP Blanca + (New riverbed along old channel)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (New riverbed along old channel)
- Case study:Little Waltham Meadows Back Channel creation + (New sluice structures)
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (Opening inlets to side channels)
- Case study:Upper Emscher + (Removal of concrete banks and bed)
- Case study:Chinbrook Meadows Wetlands + (Partial diversion of river)
- Case study:Recovery of the functionality of Brazo de la Torre + (Revetmens with local species)
- Case study:River Calder improvement project + (Partial weir removal)
- Case study:The San Marcos weir removal + (Partial weir removal)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Partially deletion of barriers)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (Partially deletion of barriers)
- Case study:RSPB Fowlmere Nature Reserve + (Cut back of plants)
- Case study:Lullingstone Castle + (Placement of faggots)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:QUERCUS Ravensbourne + (Removal of concrete banks and bed)
- Case study:Bleinheim Palace Project + (Planting)
- Case study:River Cole- Life Project + (Planting)
- Case study:River Dee + (Planting)
- Case study:Langford Lakes project + (Planting)
- Case study:River Roding at Ray Lodge Park + (Removal of revetments)
- Case study:Ladywell Fields (QUERCUS) + (Planting)
- Case study:Rother meander reconnection + (Re-grading)
- Case study:Meades water garden regeneration project + (Planting)
- Case study:Kleblach-Side channel + (Planting)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (Planting)
- Case study:River Avon Stream project + (Planting)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope)
- Case study:Rehabilitation of Benta stream + (Renewal of reventments)
- Case study:Highland Water at Warwickslade Lawn + (Planting)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Creation of gravel banks)
- Case study:Beddington Park + (Bank reprofiling)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)