Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Eastridge Estate restoration project + (Creation of fish passes)
- Case study:Butter Hill Phase 2 + (Weir notched)
- Case study:River Wandle: Butter Hill Phase 3 + (Introduction of gravel)
- Case study:River Eye + (Introducing large woody debris)
- Case study:Manor Road Park + (Creation of pools and riffles)
- Case study:Resilient River + (Introduction of gravel)
- Case study:Bleinheim Palace Project + (Planting)
- Case study:River Dee + (Planting)
- Case study:Vester Nebel Restoration + (Regrading)
- Case study:Arborfield nature like bypass and weirs project + (Introduction of spawning gravels)
- Case study:Pearls in Peril LIFE+ GB Project - River Evelix + (Introduction of spawning gravels)
- Case study:Salisbury Avon Restoration Project + (Introduction of spawning gravels)
- Case study:Pearls in Peril LIFE+ GB Project - River Oykel + (Introduction of spawning gravels)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Excavation of bedrock)
- Case study:Restoring sea-trout and salmon habitat in Aurlandselva + (Weir removal)
- Case study:Enler River enhancement project + (Deflectors)
- Case study:The Pentney Restoration Project + (Recovery of channel morphology)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:Pearls in Peril LIFE+ GB Project - Afon Eden + (Introduction of spawning gravels)
- Case study:Pearls in Peril LIFE+ GB Project - River Borgie + (Introduction of spawning gravels)
- Case study:Pearls in Peril LIFE+ GB Project - Mingary Burn + (Introduction of spawning gravels)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Deflectors)
- Case study:Restoration of spawning grounds for trout in Bjornesfjorden (Hardangervidda) + (Creation of fish spawn nursing places)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (Land movement (the design of the condition … Land movement (the design of the conditioning of the riverbed has been adapted to the natural conformation of the stream with slopes to avoid erosion and facilitate its subsequent revegetation); Defense of the riverbanks ( the breakwater structures foreseen in the project have been placed in order to guarantee the structural stability and the collapses to the riverbed).bility and the collapses to the riverbed).)
- Case study:Restoration of the river area of the section of Betzuca stream + (Landscape integration of the breakwater)
- Case study:Moreton Channel Gravel Reprofiling + (Large woody derbis dams)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Large woody derbis dams)
- Case study:Peatland restoration project: Rivers Alport and Ashop + (Large woody derbis dams)
- Case study:River Dart (Totnes) hydropower + (Larinier fish pass)
- Case study:Borrowash fish pass + (Larinier fish pass)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill)
- Case study:South Esk restoration + (Removal of invasive species)
- Case study:Sir Maesyfed Salar 2012 (SMS 12) + (Livestock fencing)
- Case study:Wye (Herefordshire) Improvement Project (WHIP2) + (Livestock fencing)
- Case study:The Monmouthshire, Olway and Trothy (MOAT) Project + (Restoring rivers)
- Case study:LARA (Lugg and River Arrow) + (Creation of fish passes)
- Case study:UP! - The Usk Project + (Removal of fish barriers)
- Case study:Hoffer Brook + (Bed lowering at impoundment and bed raising with gravel (and mesh))
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Cattle drinkers)
- Case study:Wyre Riparian Restoration Initiative + (Fencing)
- Case study:RESTORATION OF THE TRESENEC STREAM + (Local deepening)
- Case study:Little Ponton + (brushwood mattress installation)
- Case study:Strategic redistribution of channel substrate + (Long-reach excavator)
- Case study:Abaissement et démantèlement de trois clapets sur l’Orge aval + (Lowering of checking valves)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Lowering of dike)
- Case study:Ontpoldering Noordwaard + (Lowering of dike)
- Case study:Restoration of a stream of the Jarama River, Valdetorres de Jarama + (Lowering of lateral slopes)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Lowering of lateral slopes)
- Case study:River Avon at East Chisenbury + (Deflectors)
- Case study:Lullingstone Castle + (Placement of faggots)
- Case study:London Olympics Parklands + (Marginal planting)
- Case study:The Taw River Improvement Project (TRIP) + (Marginal planting)