Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (habitat improvements)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Creation of a bypass)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Installation of bioengineering elements)
- Case study:River Ogwen and Nant Francon + (Installation of cascades)
- Case study:Habitat Improvements on the River Colne at West Drayton + (Installation of coir rolls)
- Case study:Lidl + (Installation of coir rolls)
- Case study:Sainsburys, Hertford + (Bank reprofiling)
- Case study:River Shuttle Enhancement Works - Love Lane + (Installation of coir rolls)
- Case study:Hackbridge Restoration + (Bank reprofiling)
- Case study:Hackbridge weir notch + (Deflectors)
- Case study:Ravensbury Park back channel + (Bank reprofiling)
- Case study:River Pinn Enhancement near Ickenham + (Installation of coir rolls)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Installation of damming valves)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Restoration of Grobruelva + (Installation of gravel habitat (gravel and stones))
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Construction of a bypass channel)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:Silverån övre + (Introduction of gravel)
- Case study:River Bure + (Introducing large woody debris)
- Case study:New Forest LIFE project + (Introducing large woody debris)
- Case study:River Kennet Restoration at Durnsford + (Regrading)
- Case study:River Avon at East Chisenbury + (Deflectors)
- Case study:River Glaven conservation group + (Re-profiling)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Lowering of dike)
- Case study:Eddleston water + (Introducing large woody debris)
- Case study:River Wandle Restoration Project + (Introducing large woody debris)
- Case study:Salisbury Avon Restoration Project + (Introduction of spawning gravels)
- Case study:Spring Meadow Meander Restoration + (Alteration in channel dimensions)
- Case study:Pickering Beck & Dutchy Water improvement project + (Soft erosion solutions)
- Case study:Unit 4 - North Channel Phase 1 + (Introducing large woody debris)
- Case study:Sculthorpe Moor Restoration Scheme + (Creation of berms)
- Case study:Great Ryburgh End Restoration Scheme + (Diversification of in-channel features)
- Case study:Bow Brook Living Landscape + (Introducing large woody debris)
- Case study:Trees on the River Uck + (Introducing large woody debris)
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe + (Introducing large woody debris)
- Case study:Plough Lane weir removal + (Bank reprofiling)
- Case study:River Avon Habitat Enhancement, Fifield + (Introducing large woody debris)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Lower Woodsford + (Introducing large woody debris)
- Case study:Peffery Project Phase 3 + (Introducing large woody debris)
- Case study:Knepp Rewilding Project + (Bank modification)