Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Southington River Restoration Project + (This project took place on the River Test at Overton)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (Banks were sloped)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (Restoration of the connection of side arms)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill)
- Case study:Little Ponton + (brushwood mattress installation)
- Case study:Beekherstel Keersop + (Hout in de beek)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:Restoration of the previous riverbed of the Dadon + (Implementation of rip rap)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:River Bure + (Introducing large woody debris)
- Case study:Opijnen- Side channel + (Improvement of natural flows)
- Case study:Spring Meadow Meander Restoration + (Alteration in channel dimensions)
- Case study:South Calder Water deculverting and habitat restoration + (Improvement of natural flows)
- Case study:Whit Beck River Restoration Project + (Improvement of natural flows)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Introducing large woody debris)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (habitat improvements)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Creation of a bypass)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Installation of bioengineering elements)
- Case study:River Ogwen and Nant Francon + (Installation of cascades)
- Case study:Habitat Improvements on the River Colne at West Drayton + (Installation of coir rolls)
- Case study:Lidl + (Installation of coir rolls)
- Case study:Sainsburys, Hertford + (Bank reprofiling)
- Case study:River Shuttle Enhancement Works - Love Lane + (Installation of coir rolls)
- Case study:Hackbridge Restoration + (Bank reprofiling)
- Case study:Hackbridge weir notch + (Deflectors)
- Case study:Ravensbury Park back channel + (Bank reprofiling)
- Case study:River Pinn Enhancement near Ickenham + (Installation of coir rolls)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Installation of damming valves)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Removal of metal sheet piles)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Removal of a part of the dam up to 1 m)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Restoration of Grobruelva + (Installation of gravel habitat (gravel and stones))
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Construction of a bypass channel)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:Silverån övre + (Introduction of gravel)
- Case study:River Bure + (Introducing large woody debris)
- Case study:New Forest LIFE project + (Introducing large woody debris)
- Case study:River Kennet Restoration at Durnsford + (Regrading)
- Case study:River Avon at East Chisenbury + (Deflectors)