Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the stream of the Partido + (Elimination of the pipeline on the left bank)
- Case study:Nar SSSI project + (Creation of shoulders)
- Case study:Braid Burn at Inch Park + (Embankment creation)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Embankment creation)
- Case study:Regelsbrunner Aue + (Embankment lowering)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacement with wood structures)
- Case study:River Alt at Knowsley + (Embankment lowering)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of fish passage)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of backwaters)
- Case study:Kirkstone Beck River Restoration + (Embankment removal)
- Case study:PROGETTO WETLAND - Volturno + (Embankment renaturalization)
- Case study:Eddleston water + (Introducing large woody debris)
- Case study:Arnos Park - Pymmes Brook + (Creation of berms)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Embankment renaturalization)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates)
- Case study:River Valency at Boscastle + (Excavation of bedrock)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Excavation of bedrock)
- Case study:Markway Stream Restoration + (Excavation of bedrock)
- Case study:Marine Colliery river blockage + (Excavator used to remove blockage)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Extensive planting)
- Case study:River Witham Great Ponton + (Tree Hinging)
- Case study:Gottar Water weir fish barrier easement + (Feasibility and Optioneering study nearing completion. Preferred option yet to be identified.)
- Case study:Wansbeck 100 + (Fenced off riverbank)
- Case study:Source to Sea Programme – 8. River Keer Restoration + (Fenced off riverbank)
- Case study:River Nene Nature Improvement Area + (Bank improvement)
- Case study:Delivering Multiple Benefits for Water on Foston Brook + (Fenced off riverbank)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Creation of revetments)
- Case study:The Irfon Special Area of Conservation Project + (Fencing)
- Case study:Pipeline and WFD Project 2 + (Fencing)
- Case study:Lugg & Arrow, Radnorshire + (Fencing)
- Case study:The Tubney Charitable Trust + (Fencing)
- Case study:WHIP - The Wye Habitat Improvement Project + (Fencing)
- Case study:Wyre Riparian Restoration Initiative + (Fencing)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Rural Enterprise Scheme + (Fish habitat restoration)
- Case study:Enler River enhancement project + (Deflectors)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Creation of pools)
- Case study:Tottenham Lock Floating Ecosystem + (Floating vegetated bank structures)
- Case study:Resilient River + (Introduction of gravel)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:River Witham Great Ponton + (Tree Hinging)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (New bioengineering elements in order to stabilize slope banks)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Removal of metal sheet piles)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacement with wood structures)
- Case study:MediCyn + (Grand Clos” site: hydraulic isolation of 3 temporary ponds to delay the date of autumn water fill in)
- Case study:Manthorpe Floodplain Reconnection + (Channel modification)
- Case study:New Forest LIFE project + (Introducing large woody debris)
- Case study:The Taw River Improvement Project (TRIP) + (Marginal planting)
- Case study:The South Hams River Improvement Project (SHRImP) + (Gravel augmentation)
- Case study:The Axe and Exe River Improvement Project (AERIP) + (Marginal planting)
- Case study:Sir Maesyfed Salar 2012 (SMS 12) + (Livestock fencing)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Weir removal)
- Case study:Biomura LIFE06NAT/SI/000066 + (Natural erosion embankments)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (Gravel bar)