Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Avon Stream project + (Planting)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope)
- Case study:Restoration of Ingarskilanjoki River + (Depth variation)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (Removal of spillway)
- Case study:Herefordshire Asset Restoration Project (HARP) + (Developing angling infrastructure)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (Dismantling of the gates that block the water current)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (Dismantling of the mill)
- Case study:Langford Lakes project + (Planting)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (Marginal planting)
- Case study:Great Ryburgh End Restoration Scheme + (Diversification of in-channel features)
- Case study:Essex Healthy Headwaters River Restoration Project + (Bank reprofiling)
- Case study:Fairham Brook Restoration Project + (Diversification of in-channel features)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:Kirkstone Beck River Restoration + (Embankment removal)
- Case study:Beekherstel Beekloop BmN + (Dood hout)
- Case study:Herinrichting beekdal Tongelreep + (Dood hout)
- Case study:Herinrichting Beekloop + (Dood hout)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Weir removal)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Dredging)
- Case study:Conservation of alluvial + (Dredging)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Dam removal)
- Case study:Water and Life for Drava and Vuka + (Dredging of sediment (mud))
- Case study:Removal of the Fatou dam on the Beaume river + (Dam removal)
- Case study:Hadfield Weir Fish Pass + (Eel pass)
- Case study:Restoration of the stream of the Partido + (Elimination of the pipeline on the left bank)
- Case study:Nar SSSI project + (Creation of shoulders)
- Case study:Braid Burn at Inch Park + (Embankment creation)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Embankment creation)
- Case study:Regelsbrunner Aue + (Embankment lowering)
- Case study:Allt Lorgy River Restoration + (Removal of in stream boulders and replacement with wood structures)
- Case study:River Alt at Knowsley + (Embankment lowering)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of fish passage)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of backwaters)
- Case study:Kirkstone Beck River Restoration + (Embankment removal)
- Case study:PROGETTO WETLAND - Volturno + (Embankment renaturalization)
- Case study:Eddleston water + (Introducing large woody debris)
- Case study:Arnos Park - Pymmes Brook + (Creation of berms)
- Case study:Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) + (Embankment renaturalization)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates)
- Case study:River Valency at Boscastle + (Excavation of bedrock)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Excavation of bedrock)
- Case study:Markway Stream Restoration + (Excavation of bedrock)
- Case study:Marine Colliery river blockage + (Excavator used to remove blockage)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Extensive planting)
- Case study:River Witham Great Ponton + (Tree Hinging)
- Case study:Gottar Water weir fish barrier easement + (Feasibility and Optioneering study nearing completion. Preferred option yet to be identified.)
- Case study:Wansbeck 100 + (Fenced off riverbank)
- Case study:Source to Sea Programme – 8. River Keer Restoration + (Fenced off riverbank)