Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Little Ouse at Thetford + (Creation of pools and riffles)
- Case study:River Ogwen and Nant Francon + (Installation of cascades)
- Case study:River Tat Restoration Scheme + (Cleaning of spawning gravels)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (Creation of pools and riffles)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles)
- Case study:Strategic redistribution of channel substrate + (Long-reach excavator)
- Case study:Manor Road Park + (Creation of pools and riffles)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (Creation of ramp)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (Removal of central slab)
- Case study:Logie Burn Restoration Project + (Re-profiling)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Creation of revetments)
- Case study:Restoring the natural dynamics of the upper Adour + (Restoration of side channels)
- Case study:River Marden at Calne + (Bedrock cascades and outcrops)
- Case study:Nar SSSI project + (Creation of shoulders)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Emptying reservoir)
- Case study:Small water retention measures in Haluzice Gorge + (Creation of stone steps)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Rétablissement de la continuité écologique sur la Luire + (Removal of hydrological structures)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Creation of bars)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Creation of wetlands)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Creation of wetlands)
- Case study:Fluvial restoration in River Carrión + (New bioengineering elements in order to stabilize slope banks)
- Case study:Babingley River at Hillington + (Creation of wooden deflectors)
- Case study:Houghton 'trout stream' enhancements + (Creation of wooden deflectors)
- Case study:Millfield Plantation 2 + (Creation of wooden deflectors)
- Case study:Dunston Beck Restoration + (faggot berms)
- Case study:River Stour Habitat Enhancements at Great and Little Bradley + (Creation of wooden deflectors)
- Case study:West End Brook - weir removal and track management + (Weir removal)
- Case study:Lodge Burn Flood Alleviation Scheme + (Culvert replacement/repair)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Culvert replacement/repair)
- Case study:Source to Sea Programme – 7. Beckfoot Ford, Barbon Beck + (Culvert replacement/repair)
- Case study:RSPB Fowlmere Nature Reserve + (Cut back of plants)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:River Kennet Restoration at Durnsford + (Regrading)
- Case study:The Irfon Special Area of Conservation Project + (Installation of watergates)
- Case study:European Fisheries Fund + (Habitat restoration)
- Case study:Friends of Afon Llwyd (FOAL) + (Removal of invasive plants)
- Case study:LARA (Lugg and River Arrow) + (Creation of fish passes)
- Case study:WHIP - The Wye Habitat Improvement Project + (Fencing)
- Case study:Fairham Brook Restoration Project + (Diversification of in-channel features)
- Case study:Stabilization of hydrological situation on the Neznaika River + (Creation of revetments)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Dam removal)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Dam removal)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Dam removal)