Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River + (Opening inlets to side channels)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Bank improvement)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Creation of gravel deflectors)
- Case study:Langonnet river + (Creation of pools and riffles)
- Case study:Morava restoration project + (Creation of groynes)
- Case study:Enler River enhancement project + (Deflectors)
- Case study:Removal of the Ver mill weir on the Sienne River + (Weir removal)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (Construction gravel bays)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Shaping and protecting water-mud biotopes in Garwolin Forest division through development of small retention + (Installation of damming valves)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Knock Burn low flow channel + (Creation of low flow channel)
- Case study:Welland for People and Wildlife Project + (Weir removal)
- Case study:Arnos Park - Pymmes Brook + (Creation of berms)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Deflectors)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Habitat improvement measures in Bortneelva + (Deflectors)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (Barrier removal)
- Case study:Restoration of the river Børselva + (Cut back of plants)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (Creation of notches)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Seeding of willows and helophytes)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Dredging)
- Case study:Rehabilitation of Benta stream + (Renewal of reventments)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (The old arm is preserved and a rockfill merlon is set up at the junction of the two beds for divert the waters to the new route)
- Case study:Nar SSSI project + (Creation of pools)
- Case study:Moreton Channel Gravel Reprofiling + (Creation of pools)
- Case study:River Darent at Hawley Manor + (Creation of pools)
- Case study:Welland for People and Wildlife Project + (Creation of pools)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (Creation of pools)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Creation of pools)
- Case study:River Slea Rehabilitation + (Creation of pools)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Creation of pools)
- Case study:Habitat improvement measures in Bortneelva + (Creation of pools)
- Case study:Restoration of the river Børselva + (Creation of pools)
- Case study:Restoration in Bognelva + (Creation of pools)
- Case study:Langonnet river + (Creation of pools and riffles)
- Case study:Bleinheim Palace Project + (Planting)
- Case study:Harbertonford Flood Alleviation Scheme + (Bed lowering)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Bank improvement)
- Case study:Mayesbrook Climate Change Park restoration project + (Recovering connectivity longitudinal and transversal)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of gravel banks)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:Castle Acre Rehabilitation Project + (Creation of pools and riffles)
- Case study:River Little Ouse at Thetford + (Creation of pools and riffles)
- Case study:River Ogwen and Nant Francon + (Installation of cascades)
- Case study:River Marden at Calne + (Bedrock cascades and outcrops)
- Case study:River Tat Restoration Scheme + (Cleaning of spawning gravels)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (Creation of pools and riffles)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles)
- Case study:Strategic redistribution of channel substrate + (Long-reach excavator)
- Case study:Manor Road Park + (Creation of pools and riffles)
- Case study:Reopening and restoration of the stream Hovinbekken + (Reopening of culverted river)
- Case study:Teglverksdammen + (Reopening of culverted river)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)