Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Creating a fishpass at Włocławek dam + (Creation of fish passes)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Construction of weak and identical slopes on straight sections)
- Case study:The Babina Restoration Project + (Create breaches in the bank)
- Case study:The Cernovca Restoration Project + (Create breaches in the bank)
- Case study:The Fortuna Restoration Project + (Create breaches in the bank)
- Case study:The Holbina-Dunavat Restoration Project + (Create breaches in the bank)
- Case study:Burn of Mosset, Forres + (Create breaches in the bank)
- Case study:River of Life + (Create breaches in the bank)
- Case study:Splash + (Created canoe access points)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds)
- Case study:The Podspády – Protected Area Bor – natural water retention by beaver weir + (Creation of a weir by beavers)
- Case study:Barking Creekmouth + (Creation of backwaters)
- Case study:Arnos Park - Pymmes Brook +
- Case study:Albany Park +
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Weir removal)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Habitat restoration)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of backwaters)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Creation of a bypass)
- Case study:River Darent at Hawley Manor + (Re-working of gravels to create riffles)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Creation of bars)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Langonnet river + (Creation of berms)
- Case study:River Pool Linear Park Enhacement + (Creation of berms)
- Case study:River Somer channel enhancement, Midsomer Norton + (Creation of berms)
- Case study:Salisbury Avon Restoration Project + (Creation of berms)
- Case study:Welland for People and Wildlife Project + (Creation of berms)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Creation of berms)
- Case study:Sculthorpe Moor Restoration Scheme + (Creation of berms)
- Case study:Arnos Park - Pymmes Brook + (Creation of berms)
- Case study:Albany Park + (Creation of berms)
- Case study:Elgin Flood Alleviation Scheme + (Creation of berms)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Creation of berms)
- Case study:Chelmer Valley Local Nature Reserve + (Creation of berms)
- Case study:River Slea Rehabilitation + (Creation of berms)
- Case study:Boosting slivso + (Creation of dike)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Reduction of bank slope)
- Case study:Rinya water-system reconstruction + (Reduction of bank slope)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (Creation of fish ladders)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Revetments with local species)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Revetments with local species)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (New bioengineering elements in order to stabilize slope banks)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (Creation of fish ladders)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (Seeding of willows and helophytes)
- Case study:The San Marcos weir removal + (Creation of fish pass)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (Dismantling of the gates that block the water current)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Removal of woody vegetation)
- Case study:Vindel River LIFE + (Re-introducing stones)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Dam removal)
- Case study:Silverån övre + (Introduction of gravel)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Installation of bioengineering elements)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones)
- Case study:Kuuskoski-Fishway + (Building of submerged weirs and pits)
- Case study:Restoration of Vakkolankoski Torrent + (Building of submerged weirs and pits)