Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Calder improvement project + (Bank stabilisation)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Coir rolls)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (Conditioning of the banks of the stream and lagoons.)
- Case study:Biomura LIFE06NAT/SI/000066 + (Natural erosion embankments)
- Case study:Keent + (Connection between river channel and former side branches)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (Construction gravel bays)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Structuring of shoreline)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Construction of a bypass channel)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Creating a fishpass at Włocławek dam + (Creation of fish passes)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Construction of weak and identical slopes on straight sections)
- Case study:The Babina Restoration Project + (Create breaches in the bank)
- Case study:The Cernovca Restoration Project + (Create breaches in the bank)
- Case study:The Fortuna Restoration Project + (Create breaches in the bank)
- Case study:The Holbina-Dunavat Restoration Project + (Create breaches in the bank)
- Case study:Burn of Mosset, Forres + (Create breaches in the bank)
- Case study:River of Life + (Create breaches in the bank)
- Case study:Splash + (Created canoe access points)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Creation of bars)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Creation of a bypass)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Creation of a bypass)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Creation of a bypass)
- Case study:The Podspády – Protected Area Bor – natural water retention by beaver weir + (Creation of a weir by beavers)
- Case study:Barking Creekmouth + (Creation of backwaters)
- Case study:Arnos Park - Pymmes Brook + (Creation of berms)
- Case study:Albany Park + (Creation of berms)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Weir removal)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Habitat restoration)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of backwaters)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs +
- Case study:River Darent at Hawley Manor + (Re-working of gravels to create riffles)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Creation of pools and riffles)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Creation of bars)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Langonnet river + (Creation of pools and riffles)
- Case study:River Pool Linear Park Enhacement + (Creation of berms)
- Case study:River Somer channel enhancement, Midsomer Norton + (Weir removal)
- Case study:Salisbury Avon Restoration Project + (Introduction of spawning gravels)
- Case study:Welland for People and Wildlife Project + (Weir removal)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of fish passage)
- Case study:Sculthorpe Moor Restoration Scheme + (Creation of berms)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement)
- Case study:Chelmer Valley Local Nature Reserve + (Creation of berms)
- Case study:River Slea Rehabilitation + (Creation of pools)
- Case study:Boosting slivso + (Creation of dike)