Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Glaisdale Beck Restoration Project + (Cattle drinkers)
- Case study:Manthorpe Floodplain Reconnection + (Channel modification)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel narrowing)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Ecological Restoration of Natural Lake Pochina + (Morphological diversification)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (Bank improvement)
- Case study:SMURF Tame + (Bank improvement)
- Case study:Day Brook Restoration - Gedling + (Channel reprofiling)
- Case study:Babbs Mill reed bed + (Channel reprofiling)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Channel reprofiling)
- Case study:Bocking Blackwater River Restoration + (Soft engineering solutions)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement)
- Case study:Tichborne River Restoration Project + (Channel reprofiling)
- Case study:Taming the Tame + (Channel reprofiling)
- Case study:Wildling the Tame + (Channel reprofiling)
- Case study:Babingley River at Hillington + (Creation of wooden deflectors)
- Case study:Houghton 'trout stream' enhancements + (Creation of wooden deflectors)
- Case study:River Tat Restoration Scheme + (Cleaning of spawning gravels)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Habitat restoration)
- Case study:The Wye & Usk Passport + (Cleared debris)
- Case study:River Calder improvement project + (Bank stabilisation)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (Conditioning of the banks of the stream and lagoons.)
- Case study:Biomura LIFE06NAT/SI/000066 + (Natural erosion embankments)
- Case study:Keent + (Connection between river channel and former side branches)
- Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) + (Construction gravel bays)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Structuring of shoreline)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (Construction of a bypass channel)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Restoration of R. Odelouca + (rehabilitate highly eroded and degraded river banks)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Creating a fishpass at Włocławek dam + (Creation of fish passes)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (Construction of dams)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Construction of flood channels)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (Construction of weak and identical slopes on straight sections)
- Case study:The Babina Restoration Project + (Create breaches in the bank)
- Case study:The Cernovca Restoration Project + (Create breaches in the bank)
- Case study:The Fortuna Restoration Project + (Create breaches in the bank)
- Case study:The Holbina-Dunavat Restoration Project + (Create breaches in the bank)
- Case study:Burn of Mosset, Forres + (Create breaches in the bank)
- Case study:River of Life + (Create breaches in the bank)
- Case study:Splash + (Created canoe access points)
- Case study:Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) + (Creation of undercut banks)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Creation of bars)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (implementation of Pool/riffle sequesnces)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Installation of a distribution structure and monks)