Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Tarrant Rehabilitation Project + (Bed reprofiling)
- Case study:River Wensum Restoration, Reach 10 Lenwade + (Bank reprofiling)
- Case study:River Marden at Calne + (Bedrock cascades and outcrops)
- Case study:Wyndham Park, Grantham + (Adding Gravel)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:Beekherstel Leerinkbeek + (Beschaduwing)
- Case study:Beekherstel Ramsbeek + (Beschaduwing)
- Case study:Beekherstel Beekloop BmN + (Dood hout)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Habitat improvement measures in Bortneelva + (Deflectors)
- Case study:Source to Sea Programme + (Blocking of certain grips)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Blocking of certain grips)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Blocking of certain grips)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Abundant sand was being put on the banks)
- Case study:Ddu Restoration Project + (Boulder restoration)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Breaking the dune barrier and establishing a temporary connecting channel between the lagoon and the sea)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Building nature-like bypass channel)
- Case study:Ruppoldingen + (Building nature-like bypass channel)
- Case study:Rodley weir by pass channel + (Building nature-like bypass channel)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Partially deletion of barriers)
- Case study:Kuuskoski-Fishway + (Building of submerged weirs and pits)
- Case study:Restoration of Vakkolankoski Torrent + (Building of submerged weirs and pits)
- Case study:Restoration of Naarkoski Torrent + (Building of submerged weirs and pits)
- Case study:Sågarsfors + (Building of submerged weirs and pits)
- Case study:Restoration of Longinoja brook + (Building of submerged weirs and pits)
- Case study:Restoration of Enningdalsälv River + (Building of submerged weirs and pits)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones)
- Case study:Mulkear Life Project + (Cattle drinkers)
- Case study:Drayton + (Cattle drinkers)
- Case study:River Restoration at Hunworth (River Glaven) + (Cattle drinkers)
- Case study:Bow Brook Living Landscape + (Cattle drinkers)
- Case study:Hoffer Brook + (Cattle drinkers)
- Case study:River Meden response to diffuse pollution + (Cattle drinkers)
- Case study:Markeaton and Mackworth Brook (MMB) Project + (Cattle drinkers)
- Case study:Glaisdale Beck Restoration Project + (Cattle drinkers)
- Case study:Manthorpe Floodplain Reconnection + (Channel modification)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel narrowing)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Ecological Restoration of Natural Lake Pochina + (Morphological diversification)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (Bank improvement)
- Case study:SMURF Tame + (Bank improvement)
- Case study:Day Brook Restoration - Gedling + (Channel reprofiling)
- Case study:Babbs Mill reed bed + (Channel reprofiling)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Channel reprofiling)
- Case study:Bocking Blackwater River Restoration + (Soft engineering solutions)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement)
- Case study:Tichborne River Restoration Project + (Channel reprofiling)
- Case study:Taming the Tame + (Channel reprofiling)
- Case study:Wildling the Tame + (Channel reprofiling)
- Case study:Babingley River at Hillington + (Creation of wooden deflectors)
- Case study:Houghton 'trout stream' enhancements + (Creation of wooden deflectors)
- Case study:River Tat Restoration Scheme + (Cleaning of spawning gravels)
- Case study:Louds Mill (Downstream)m Enhancement + (Bank reprofiling)