- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Bed raising)
- Case study:Odder Stream Restoration + (Re-introducing spawning gravel)
- Case study:Upper Emscher + (Removal of concrete banks and bed)
- Case study:Wild Wylye Phase 1 + (Bed raising)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Weir removal/modification for easement of fish passage)
- Case study:Charlton St Peter A 8 + (Bed raising)
- Case study:Holmsley Inclosure Stream Restoration + (Bed raising)
- Case study:Test and Itchen River Restoration Strategy + (Bed raising)
- Case study:Old Station Beat restoration, River Test at Bossington + (Bed raising)
- Case study:Glenbrook Wetlands + (Bed raising)
- Case study:West Amesbury + (Bed raising)
- Case study:River Glyme Stratford Restoration + (Introducing large woody debris)
- Case study:River Eye + (Introducing large woody debris)
- Case study:HLS New Forest + (Bed raising)
- Case study:Bringing Back the Bulbourne + (Re-grading)
- Case study:Test and Itchen River Restoration Strategy 2 + (Bed raising)
- Case study:Moreton Channel Gravel Reprofiling + (Bed reprofiling)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Bank improvement)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Bed reprofiling)
- Case study:Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS) + (Creation of fish passes)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Bank reprofiling)
- Case study:River Tarrant Rehabilitation Project + (Bed reprofiling)
- Case study:River Wensum Restoration, Reach 10 Lenwade + (Bank reprofiling)
- Case study:River Marden at Calne + (Bedrock cascades and outcrops)
- Case study:Wyndham Park, Grantham + (Adding Gravel)
- Case study:Upper River Witham : Easton + (Weir Removal)
- Case study:Beekherstel Leerinkbeek + (Beschaduwing)
- Case study:Beekherstel Ramsbeek + (Beschaduwing)
- Case study:Beekherstel Beekloop BmN + (Beschaduwing)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Habitat improvement measures in Bortneelva + (Deflectors)
- Case study:Source to Sea Programme + (Blocking of certain grips)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Blocking of certain grips)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Blocking of certain grips)
- Case study:Effacement du seuil de Chelles Basse sur le Miodet + (Abundant sand was being put on the banks)
- Case study:Ddu Restoration Project + (Boulder restoration)
- Case study:Biotop and flood measures in the Mykle river (Mykleelva) and Vanebu river (Vanebuelva) + (Creation of fish refuge areas)
- Case study:INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract + (Breaking the dune barrier and establishing a temporary connecting channel between the lagoon and the sea)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Building nature-like bypass channel)
- Case study:Ruppoldingen + (Building nature-like bypass channel)
- Case study:Rodley weir by pass channel + (Building nature-like bypass channel)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (Partially deletion of barriers)
- Case study:Kuuskoski-Fishway + (Building of submerged weirs and pits)
- Case study:Restoration of Vakkolankoski Torrent + (Building of submerged weirs and pits)
- Case study:Restoration of Naarkoski Torrent + (Building of submerged weirs and pits)
- Case study:Sågarsfors + (Building of submerged weirs and pits)
- Case study:Restoration of Longinoja brook + (Building of submerged weirs and pits)
- Case study:Restoration of Enningdalsälv River + (Building of submerged weirs and pits)
- Case study:Timber float restorations at River Iijoki + (Building submerged weir)
- Case study:Restoration of Reinikkalankoski torrent + (Re-introducing stones)
- Case study:Mulkear Life Project + (Weir removal/modification for easement of fish passage)
- Case study:Drayton + (Deflectors)
- Case study:River Restoration at Hunworth (River Glaven) + (Channel reprofiling)