Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Stainby Road, Colsterworth + (Bank Lowering)
- Case study:Chambers Wharf + (Bank improvement)
- Case study:Rams Brewery + (Bank improvement)
- Case study:Greenwich Peninsula + (Bank improvement)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Bank improvement)
- Case study:Rheinauen bei Rastatt + (Bank improvement)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Bank improvement)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Bank improvement)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of gravel banks)
- Case study:River Rea Restoration Project + (Bank improvement)
- Case study:Rio Tepice urban restoration + (Bank improvement)
- Case study:River Fugla + (Bank improvement)
- Case study:Spring Meadow Meander Restoration + (Alteration in channel dimensions)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Bank improvement)
- Case study:River Nene Nature Improvement Area + (Bank improvement)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (Bank improvement)
- Case study:SMURF Tame + (Bank improvement)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Alteration in channel dimensions)
- Case study:Bocking Blackwater River Restoration + (Soft engineering solutions)
- Case study:Friends of Afon Llwyd (FOAL) + (Removal of invasive plants)
- Case study:LARA (Lugg and River Arrow) + (Creation of fish passes)
- Case study:Saving Chiswick Eyot + (Bank stabilisation)
- Case study:Elgin Flood Alleviation Scheme + (Bank improvement)
- Case study:Pearls in Peril LIFE+ GB Project - River South Esk + (Bank improvement)
- Case study:Belton Floodplain Reconnection and River Restoration + (Channel narrowing)
- Case study:Knepp Rewilding Project + (Bank modification)
- Case study:River Idle Restoration Project + (Bank modification)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds)
- Case study:River Ebbw Bank Stabilisation + (Bank protection)
- Case study:Diversion of the River Nith + (Bank protection)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (Bank protection)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Bank protection)
- Case study:Logie Burn Restoration Project + (Bank protection)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Bank protection)
- Case study:Restoring the natural dynamics of the upper Adour + (Bank protection)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (Bank protection)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (Bank protection)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (Bank protection)
- Case study:Cornmill Gardens (QUERCUS) + (Removal of concrete banks and bed)
- Case study:QUERCUS Ravensbourne + (Removal of concrete banks and bed)
- Case study:PROGETTO WETLAND - Volturno + (Embankment renaturalization)
- Case study:River Cleddau + (New bioengineering elements in order to stabilize slope banks)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Weir construction)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (Revetmens with local species)
- Case study:Fluvial restoration in River Carrión + (New bioengineering elements in order to stabilize slope banks)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Coir rolls)
- Case study:Isar-Plan + (Deepening of river floor)
- Case study:Rijkelse Bemden - River bed widening + (Bank reprofiling)
- Case study:Wummewiesen restoration project + (Weir removal)
- Case study:Beneden-Leeuwen-Side channel + (Bank reprofiling)
- Case study:Millingerwaard-Floodplain rehabilitation + (Bank reprofiling)
- Case study:River Rhee + (Bank reprofiling)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Deflectors)
- Case study:Short Heath Brook Project + (Bank reprofiling)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (New bioengineering elements in order to stabilize slope banks)
- Case study:Rottal Burn + (Adding sinuosity)
- Case study:Mayesbrook Climate Change Park restoration project + (Recovering connectivity longitudinal and transversal)
- Case study:River Wandle Restoration Project + (Introducing large woody debris)