Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Aforestation)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Aforestation)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (Construction of a defensive wall to prevent river pollution)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (highten the bottom of the stream to reconnect alluvial wetlands)
- Case study:Reconstitution du matelas alluvial de la Vesgre à Houdan + (Planting)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (excavation and embankment)
- Case study:Letting the Dove Flow + (Allowing stone weirs and bank reinforcements to break down)
- Case study:Letting the Dove Flow 2 + (removing or breaching weirs and reinforcements)
- Case study:Voorste Nete at Dessel + (Translocation of original substrate into new channel)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Weir removal)
- Case study:Spring Meadow Meander Restoration + (Alteration in channel dimensions)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Alteration in channel dimensions)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Construction of a bypass channel)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Removal of treshold)
- Case study:Stainby Road, Colsterworth + (Bank Lowering)
- Case study:Chambers Wharf + (Bank improvement)
- Case study:Rams Brewery + (Bank improvement)
- Case study:Greenwich Peninsula + (Bank improvement)
- Case study:River Stour at Glen's weir (Throop fisheries) + (Bank improvement)
- Case study:Rheinauen bei Rastatt + (Bank improvement)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Bank improvement)
- Case study:Mill house private hydroelectric power generation scheme and fish pass + (Bank improvement)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of gravel banks)
- Case study:River Rea Restoration Project + (Bank improvement)
- Case study:Rio Tepice urban restoration + (Bank improvement)
- Case study:River Fugla + (Bank improvement)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Bank improvement)
- Case study:River Nene Nature Improvement Area + (Bank improvement)