Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Vallacuera Ravine. Removal of a dyke + (0.003)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (0.003)
- Case study:Restoration of the river continuity on the Touques Basin + (0.003)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (0.0049)
- Case study:Valtellina 2005 – New green system + (0.005)
- Case study:Langonnet river + (0.00512)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (0.00595)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (0.006)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (0.006)
- Case study:New Forest LIFE project + (0.0066)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (0.0066)
- Case study:Herinrichting beekdal Tongelreep + (0.0066)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (0.0074)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (0.0079)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (0.008)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (0.008)
- Case study:Effacement du seuil de Carayon sur le Thoré + (0.008)
- Case study:Stora, Holstebro HEP station + (0.00809)
- Case study:Welton Farm Landfill/Riverbank Works + (0.0083)
- Case study:Regeneration of the banks of the river Mape + (0.0085)
- Case study:Removal of five Lakes on the Val des Choues stream + (0.01)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (0.01)
- Case study:Removal of the Brosses weir on the Soanan River + (0.01)
- Case study:Rétablissement de la continuité écologique sur la Luire + (0.011)
- Case study:Rio Tepice urban restoration + (0.013)
- Case study:The Babina Restoration Project + (0.015)
- Case study:The Cernovca Restoration Project + (0.015)
- Case study:The Fortuna Restoration Project + (0.015)
- Case study:The Holbina-Dunavat Restoration Project + (0.015)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (0.015)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (0.015)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (0.015)
- Case study:Černý potok stream restoration scheme + (0.025)
- Case study:Blanice River + (0.0515)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (0.1)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (0.1)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (0.13)
- Case study:Land acquisition on the banks of the Ouche River + (0.13)
- Case study:Removal and opening of sluice gates on the Vence River + (0.15)
- Case study:Restoration of Myllypuro brook + (0.17)
- Case study:PROGETTO WETLAND - Volturno + (0.2)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (0.2)
- Case study:Restoration of the previous riverbed of the Dadon + (0.25)
- Case study:River Quaggy- Chinbrook meadows + (0.3)
- Case study:Vester Nebel Restoration + (0.3)
- Case study:Removal of the Fatou dam on the Beaume river + (0.37)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (0.7)
- Case study:Beekherstel Keersop + (0.88)
- Case study:Partial removal of weir on the Thouet at Le Tallud + (1.3)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (1.5)