Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Logie Burn Restoration Project + (0.0016)
- Case study:Beekherstel Leerinkbeek + (0.0016)
- Case study:Jufferbeek + (0.0016)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (0.0018)
- Case study:Hooge Raam + (0.0018)
- Case study:Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise + (0.00184)
- Case study:Agreed definition of mobility area for the Adour + (0.002)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (0.002)
- Case study:Buenz + (0.002)
- Case study:Restorations of Ritobäcken brook + (0.002)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (0.002)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (0.002)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (0.002)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (0.002)
- Case study:Lowering the weir of the Houël mill on the Leff River + (0.00235)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (0.0024)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (0.00262)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (0.00262)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (0.003)
- Case study:Vallacuera Ravine. Removal of a dyke + (0.003)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (0.003)
- Case study:Restoration of the river continuity on the Touques Basin + (0.003)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (0.0049)
- Case study:Valtellina 2005 – New green system + (0.005)
- Case study:Langonnet river + (0.00512)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (0.00595)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (0.006)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (0.006)
- Case study:New Forest LIFE project + (0.0066)
- Case study:Reméandrage de la Veyre en amont du lac d’Aydat + (0.0066)
- Case study:Herinrichting beekdal Tongelreep + (0.0066)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (0.0074)
- Case study:Suppression de l’étang de Condé-sur-Iton et restauration de zones humides + (0.0079)
- Case study:Restauration du matelas alluvial du ruisseau de Trémeret à Ambon + (0.008)
- Case study:Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin + (0.008)
- Case study:Effacement du seuil de Carayon sur le Thoré + (0.008)
- Case study:Stora, Holstebro HEP station + (0.00809)
- Case study:Welton Farm Landfill/Riverbank Works + (0.0083)
- Case study:Regeneration of the banks of the river Mape + (0.0085)
- Case study:Removal of five Lakes on the Val des Choues stream + (0.01)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (0.01)
- Case study:Removal of the Brosses weir on the Soanan River + (0.01)
- Case study:Rétablissement de la continuité écologique sur la Luire + (0.011)
- Case study:Rio Tepice urban restoration + (0.013)
- Case study:Restoring the natural dynamics of the upper Adour + (0.0135)
- Case study:The Babina Restoration Project + (0.015)
- Case study:The Cernovca Restoration Project + (0.015)
- Case study:The Fortuna Restoration Project + (0.015)
- Case study:The Holbina-Dunavat Restoration Project + (0.015)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (0.015)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (0.015)