Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Logie Burn Restoration Project + (Addy, S.; Ghimire, S. and Cooksley, S. (2012) Assessment of the multiple benefits of river restoration: the Logie Burn meander reconnection project)
- Case study:Holmsley Inclosure Stream Restoration + (After LIFE conservation plan)
- Case study:Markway Stream Restoration + (After LIFE conservation plan)
- Case study:Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon + (All information on this page is copied from the AFB, the French organisation for biodiversity.)
- Case study:Restoration of the river continuity on the Touques Basin + (All information on this page is copied from the AFB, the French organisation for biodiversity.)
- Case study:Effacement du seuil du moulin du Bourg sur le Vicoin + (All information on this page is copied from the AFB, the French organisation for biodiversity.)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (All information on this page is copied from this article written by Fernando Magdaleno.)
- Case study:Experimental flood in the Pisuerga river + (All information on this page is copied from this article written by Fernando Magdaleno.)
- Case study:Experimental flood in the Cardener river + (All information on this page is copied from this article written by Fernando Magdaleno.)
- Case study:Experimental flood in the Ebro river + (All information on this page is copied from this article written by Fernando Magdaleno.)
- Case study:The San Marcos weir removal + (A link on the Wetlands International website to a document that describes the project.)
- Case study:Inturia dam removal + (A link on the Wetlands International website to a document that describes the project.)
- Case study:Robledo de Chavela dam removal + (A link on the Wetlands International website to a document that describes the project.)
- Case study:La Gotera dam removal + (A link on the Wetlands International website to a document that describes the project.)
- Case study:Fish pass on the Najerilla River + (A link on the Wetlands International website to a document that describes the project.)
- Case study:Fish pass in Las Librerías weir on the Guadiela River + (A link on the Wetlands International website to a document that describes the project.)
- Case study:Small Retention - Big Deal, A National Program on Natural Small Water Retention Measures + (All information on this page is copied from an article written by Waldemar Mioduszewski and Tomasz Okruszko for GWP Poland.)
- Case study:Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont + (All information on this page is copied from the AFB, The French Agency for biodiversity)
- Case study:Reopening of the culverted Redon river + (All information on this page is copied from the AFB, The French Agency for biodiversity)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Restoration of side channels of the Loire and its tributaries + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (All information on this page is copied from the AFB, The French Agency for biodiversity.)
- Case study:Restoring the natural dynamics of the upper Adour + (All information on this page is copied from the AFB, The French Agency for biodiversity.)