Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Project drawings)
- Case study:Eddleston water + (Project information leaflet)
- Case study:Longstreet A 91a + (Project summary)
- Case study:Ladywell Fields (QUERCUS) + (post project report)
- Case study:Ecological Restoration of Natural Lake Pochina + (Recognising the importance of South East European landscapes)
- Case study:Ecological Restoration of Vlascuta Lake + (Recognising the importance of South East European landscapes)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Recognising the importance of South East European landscapes)
- Case study:Source to Sea Programme – 5. Borrowdale Moss, Peatland Restoration + (Report of project up to June 2014)
- Case study:Old Station Beat restoration, River Test at Bossington + (Outline Plan ©Cain Bio-Engineering Ltd.)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Restoration work on the Upper Dee)
- Case study:Quaggy Flood Alleviation Scheme + (General Information)
- Case study:Pearls in Peril LIFE+ GB Project - River Borgie + (River Borige area of conservation action)
- Case study:River Irwell Restoration Project + (River Irwell potential for enhancement and restoration)
- Case study:Narborough Rehabilitation Project + (River Nar Rehabilitation summary by Nigel Holmes)
- Case study:West Lexham Rehabilitation Project + (River Nar Rehabilitation summary report by Nigel Holmes)
- Case study:Castle Acre Rehabilitation Project + (River Nar Rehabilitation summary report by Nigel Holmes)
- Case study:Sculthorpe Moor Restoration Scheme + (River Wensum Restoration Strategy Newsletter - Februrary 2014)
- Case study:Ullswater Catchment Restoration + (RiverPrize video)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Riverbanks restoration handbook for the Segura river basin)
- Case study:River Nene Nature Improvement Area + (SPARC project magazine)
- Case study:Sherborne Windrush Restoration Project + (Sherborne Windrush Project Briefing Note)
- Case study:Cudworth dyke restoration project + (Yorkshire waters catchment pressures and soltuions assesment)
- Case study:River restoration project in Sella, Asturias + (Social involvement document)
- Case study:Ladywell Fields (QUERCUS) + (post project report)
- Case study:River Worfe Restoration Initiative + (Wolfe poster)
- Case study:London Olympics Parklands + (Olympic Parklands Green Infrastructure ODA document)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Design Plan)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Design Plan)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Design Plan)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Design Plan)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (The French National Agency for Water and Aquatic Environments (ONEMA) case study)
- Case study:The Holbina-Dunavat Restoration Project + (The evolution process in Holbina-Dunavat area during restoration works)
- Case study:Amerongse Bovenpolder + (The management plan 2011-2021 for the Amerongse Bovenpolder and the Amerongse bos (Dutch))
- Case study:More space for the river Orbigo + (Video on the Orbigo project (English and Spanish versions available))
- Case study:Watercress Farm Rewetting Project + (Watercress Farm rewetting project at the Belmont Estate)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Wetlands Broshure)
- Case study:Resilient River + (Ailsworth Backchannel Project)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Riverbanks restoration handbook for the Segura river basin)
- Case study:Cudworth dyke restoration project + (Yorkshire waters catchment pressures and soltuions assesment)
- Case study:Removal of the Stalapos weir over the river Alagnon + (Case study description by ONEMA (French National Agency for Water and Aquatic Environments) (in French))
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (briefing note)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (briefing note)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (briefing note)
- Case study:River Hogsmill Restoration Project + (Hogsmill proposal)
- Case study:Quaggy channel improvements + (leaflet)
- Case study:Manor Park + (plans)
- Case study:River Quaggy- Chinbrook meadows + (Overview leaflet)
- Case study:Rheinfelden bypass + (new bypass channel)