Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Wild Wylye Phase 1 + (Maps with the final designs)
- Case study:Teglverksdammen + (Master Thesis Burgess 2018: Development in Phytoplankton Assemblages, Ecological Status and Purification Effect in Teglverksdammen)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (NEar nature water courses at hydropower stations PLANTS AS FISHWAYS AND RUNNING WATER HABITATS)
- Case study:Resilient River + (Ailsworth Backchannel Project)
- Case study:Arborfield nature like bypass and weirs project + (Photo update from October 2012 (courtesy of Dominic Martyn))
- Case study:Noard-Fryslân Bûtendyks Managed Realignment Scheme + (Noard fryslan Butendyks Managed realignment scheme ABPmer summary)
- Case study:London Olympics Parklands + (Olympic Parklands Green Infrastructure ODA document)
- Case study:Old Station Beat restoration, River Test at Bossington + (Outline Plan ©Cain Bio-Engineering Ltd.)
- Case study:Downham Playing Fields + (Overall Planning)
- Case study:River Quaggy- Chinbrook meadows + (Overview leaflet)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (PDF information (in Spanish))
- Case study:Long Preston Deeps Flood Plain Project + (Phase 2 river restoration works summary)
- Case study:Arborfield nature like bypass and weirs project + (Photo update from October 2012 (courtesy of Dominic Martyn))
- Case study:Eden Crayfish Restoration Project + (CRF Project briefing note - Eden Crayfish)
- Case study:Salisbury Avon Restoration Project + (Project Briefing Note)
- Case study:Telford Catchment Restoration Project + (Project Briefing Note)
- Case study:Upper River Witham : Easton + (Project Case Study)
- Case study:River Witham Great Ponton + (Project Case Study)
- Case study:Grantham Blue Green - Urban Reach + (Project Case Study)
- Case study:Wyndham Park, Grantham + (Project Case Study)
- Case study:Syston and Barkston Restoration + (Project Case Study)
- Case study:Aubourn Rock Ramp and Habitat Works + (Project Case Study)
- Case study:Westborough + (Project Case Study)
- Case study:Little Ponton + (Project Case Study)
- Case study:Unit 3a – Hurst Bridge 2013 + (Project Record)
- Case study:River Avon Habitat Enhancement, Fifield + (Project Summary)
- Case study:West Amesbury + (Project Summary)
- Case study:Wansbeck 100 + (Project briefing note)
- Case study:Stainby Road, Colsterworth + (Project case study.)
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Project drawings)
- Case study:Eddleston water + (Project information leaflet)
- Case study:Longstreet A 91a + (Project summary)
- Case study:Ladywell Fields (QUERCUS) + (post project report)
- Case study:Ecological Restoration of Natural Lake Pochina + (Recognising the importance of South East European landscapes)
- Case study:Ecological Restoration of Vlascuta Lake + (Recognising the importance of South East European landscapes)