Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Final Life report (in Italian))
- Case study:Belton Floodplain Reconnection and River Restoration + (Final Phase Case Study)
- Case study:River Nene Nature Improvement Area + (SPARC project magazine)
- Case study:Reopening of Mjølløst stream + (Description of the culverted stream, and initial technical proposal for deculverting (in Norwegian))
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Add. Docs (in Spanish))
- Case study:Cudworth dyke restoration project + (Yorkshire waters catchment pressures and soltuions assesment)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Leght profile of the brook (Arne Jørgen))
- Case study:Upper River Nairn restoration project + (Aberarder channel evolution)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (Map of the rivers that were restored.)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Map_1)
- Case study:Wild Wylye Phase 1 + (Maps with the final designs)
- Case study:Teglverksdammen + (Master Thesis Burgess 2018: Development in Phytoplankton Assemblages, Ecological Status and Purification Effect in Teglverksdammen)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (NEar nature water courses at hydropower stations PLANTS AS FISHWAYS AND RUNNING WATER HABITATS)
- Case study:Resilient River + (Ailsworth Backchannel Project)
- Case study:Arborfield nature like bypass and weirs project + (Photo update from October 2012 (courtesy of Dominic Martyn))
- Case study:Noard-Fryslân Bûtendyks Managed Realignment Scheme + (Noard fryslan Butendyks Managed realignment scheme ABPmer summary)
- Case study:London Olympics Parklands + (Olympic Parklands Green Infrastructure ODA document)
- Case study:Old Station Beat restoration, River Test at Bossington + (Outline Plan ©Cain Bio-Engineering Ltd.)
- Case study:Downham Playing Fields + (Overall Planning)
- Case study:River Quaggy- Chinbrook meadows + (Overview leaflet)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (PDF information (in Spanish))
- Case study:Long Preston Deeps Flood Plain Project + (Phase 2 river restoration works summary)
- Case study:Eden Crayfish Restoration Project + (CRF Project briefing note - Eden Crayfish)
- Case study:Salisbury Avon Restoration Project + (Project Briefing Note)
- Case study:Telford Catchment Restoration Project + (Project Briefing Note)
- Case study:Upper River Witham : Easton + (Project Case Study)
- Case study:River Witham Great Ponton + (Project Case Study)
- Case study:Grantham Blue Green - Urban Reach + (Project Case Study)
- Case study:Wyndham Park, Grantham + (Project Case Study)
- Case study:Syston and Barkston Restoration + (Project Case Study)
- Case study:Aubourn Rock Ramp and Habitat Works + (Project Case Study)
- Case study:Westborough + (Project Case Study)
- Case study:Little Ponton + (Project Case Study)
- Case study:Unit 3a – Hurst Bridge 2013 + (Project Record)
- Case study:River Avon Habitat Enhancement, Fifield + (Project Summary)
- Case study:West Amesbury + (Project Summary)