Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Design Plan)
- Case study:Drayton + (Drayton case study)
- Case study:Saltburn Gill ironstones mines + (EA, 2010. Abandoned mines case study: Saltburn Gill ironstone mines)
- Case study:Eden Crayfish Restoration Project + (CRF Project briefing note - Eden Crayfish)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Environment Agency Healthy Catchments Guidance - Case Study)
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Aquatic Refuge Identification Plan)
- Case study:Resilient River + (Ailsworth Backchannel Project)
- Case study:Quaggy Flood Alleviation Scheme + (General Information)
- Case study:Chambers Wharf + (Good Practice case study 1)
- Case study:Rams Brewery + (Good Practice case study number 2)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (Great Ryburgh Fact Sheet 2)
- Case study:River Hogsmill Restoration Project + (Hogsmill proposal)
- Case study:Černý potok stream restoration scheme + (Hydrograph - restored versus deepened channel)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (In-stream restoration and area of conservation action on the Upper Spey)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Final Life report (in Italian))
- Case study:Belton Floodplain Reconnection and River Restoration + (Final Phase Case Study)
- Case study:River Nene Nature Improvement Area + (SPARC project magazine)
- Case study:Reopening of Mjølløst stream + (Description of the culverted stream, and initial technical proposal for deculverting (in Norwegian))
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (LIFE Report)
- Case study:Cudworth dyke restoration project + (Yorkshire waters catchment pressures and soltuions assesment)
- Case study:Built Kjøsnesbekken in the river Stjørdalselva + (Leght profile of the brook (Arne Jørgen))
- Case study:Upper River Nairn restoration project + (Aberarder channel evolution)
- Case study:Restoration of the rivers connected to the Lake Kitkajärvi + (Map of the rivers that were restored.)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (Map_1)
- Case study:Wild Wylye Phase 1 + (Maps with the final designs)
- Case study:Teglverksdammen + (Master Thesis Burgess 2018: Development in Phytoplankton Assemblages, Ecological Status and Purification Effect in Teglverksdammen)
- Case study:Albbruck-Dogern (bypass and nature-like pool pass) + (NEar nature water courses at hydropower stations PLANTS AS FISHWAYS AND RUNNING WATER HABITATS)
- Case study:Resilient River + (Ailsworth Backchannel Project)
- Case study:Arborfield nature like bypass and weirs project + (Photo update from October 2012 (courtesy of Dominic Martyn))
- Case study:Noard-Fryslân Bûtendyks Managed Realignment Scheme + (Noard fryslan Butendyks Managed realignment scheme ABPmer summary)
- Case study:London Olympics Parklands + (Olympic Parklands Green Infrastructure ODA document)
- Case study:Old Station Beat restoration, River Test at Bossington + (Outline Plan ©Cain Bio-Engineering Ltd.)
- Case study:Downham Playing Fields + (Overall Planning)
- Case study:River Quaggy- Chinbrook meadows + (Overview leaflet)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (PDF information (in Spanish))
- Case study:Long Preston Deeps Flood Plain Project + (Phase 2 river restoration works summary)
- Case study:Eden Crayfish Restoration Project + (CRF Project briefing note - Eden Crayfish)
- Case study:Salisbury Avon Restoration Project + (Project Briefing Note)
- Case study:Telford Catchment Restoration Project + (Project Briefing Note)
- Case study:Upper River Witham : Easton + (Project Case Study)
- Case study:River Witham Great Ponton + (Project Case Study)
- Case study:Grantham Blue Green - Urban Reach + (Project Case Study)
- Case study:Wyndham Park, Grantham + (Project Case Study)
- Case study:Syston and Barkston Restoration + (Project Case Study)