Page property search
Jump to navigation
Jump to search
This page provides a browsing interface for finding all values of a property and a given page. Other available search interfaces include the property search, and the ask query builder.
List of results
- ... same view after the work. +
- Bed raising by introducing new gravels (from a local quarry). +
- During the process: narrowing at one side of the channel has already been undertaken (by installing a brushwood mattress), now waiting for the digger driver to finish the job by… +
- Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing. +
- Large scale ‘hinging’ of willows to provide additional in stream habitat. +
- Looking upstream before the work… +
- Re-opening of a back-channel provides shelter for juvenile fish. +
- Securing a log deflector to the riverbed. +
- Small in-stream structures can have significant effect on low-discharge flow patterns +
- Volunteers and tools ready for a day’s work on the river. +
- Volunteers building a natural revetment out of hazel screens to narrow the river and in the process remove rubbish (radiators) used as river bank protection. +
- … bank regrading to finish small scale channel re-alignment. +