Page property search

Jump to navigation Jump to search
Page property search

Either enter a page and property, or just a property to retrieve all assigned values.

Showing below up to 12 results starting with #1.

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ... same view after the work.  +
  • Bed raising by introducing new gravels (from a local quarry).  +
  • During the process: narrowing at one side of the channel has already been undertaken (by installing a brushwood mattress), now waiting for the digger driver to finish the job by…  +
  • Large Woody Debris Secured on the inner bend propagates sedimentation, eventually leading to channel narrowing.  +
  • Large scale ‘hinging’ of willows to provide additional in stream habitat.  +
  • Looking upstream before the work…  +
  • Re-opening of a back-channel provides shelter for juvenile fish.  +
  • Securing a log deflector to the riverbed.  +
  • Small in-stream structures can have significant effect on low-discharge flow patterns  +
  • Volunteers and tools ready for a day’s work on the river.  +
  • Volunteers building a natural revetment out of hazel screens to narrow the river and in the process remove rubbish (radiators) used as river bank protection.  +
  • … bank regrading to finish small scale channel re-alignment.  +