- 11:50, 25 May 2023 AnaStržen talk contribs uploaded File:Strenghtening the channel barrier.jpg (In total, we had to build three new barriers between the channel and the double meander to ensure the integrity of the new riverbed.)
- 11:29, 25 May 2023 AnaStržen talk contribs uploaded File:Finishing touches.jpg (The final part of the lower part of the channel is being filled in - this was the trickiest part, since it was very muddy.)
- 08:06, 25 May 2023 AnaStržen talk contribs uploaded File:First layer of soil is in.jpg (Soil was being brought to the channel by a tractor with a dump trailer.)
- 07:54, 25 May 2023 AnaStržen talk contribs uploaded File:Channel-filling2.jpg (Progress in filling in the now-dry straight channel.)
- 12:37, 24 May 2023 AnaStržen talk contribs uploaded File:Process of filling in the straight channel.jpg (The straight channel was being filled in from both sides with excavators.)
- 12:25, 24 May 2023 AnaStržen talk contribs uploaded File:Water draining.jpg (Before we could start filling in the straight channel, we had to rescue any fish and crustaceans and pump out as much water as possible, so the soil wouldn't turn to mud.)
- 12:08, 24 May 2023 AnaStržen talk contribs uploaded File:Filled-in-channel.jpg (Part of the channel is finally filled up with soil.)
- 11:17, 24 May 2023 AnaStržen talk contribs uploaded File:Channel filling.jpg (After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back.)
- 11:11, 24 May 2023 AnaStržen talk contribs uploaded File:Filling-in of the-channel.jpg (After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back.)
- 13:25, 17 May 2023 AnaStržen talk contribs uploaded File:Channel crossing.jpg (Making a new access road over the straight channel.)
- 07:54, 17 May 2023 AnaStržen talk contribs uploaded File:2020 Flooded road.jpg (In 2020, unfortunately the works could not continue due to high water levels.)
- 07:49, 17 May 2023 AnaStržen talk contribs uploaded File:Flooded road in 2020.jpg (In 2020, works could not continue, due to high water levels - the lake did not fully disappear over summer.)
- 06:41, 17 May 2023 AnaStržen talk contribs uploaded File:Finished road.jpg (Due to the wet terrain we had to strenghten the access road with gravel.)
- 12:22, 15 May 2023 AnaStržen talk contribs uploaded File:Access road preparation.jpg (Preparation of access road to the construction area.)
- 13:02, 18 April 2023 AnaStržen talk contribs uploaded File:Digging mechanisation.jpg
- 13:00, 18 April 2023 AnaStržen talk contribs uploaded File:Truck arrival.jpg (Arrival of mechanisation at the entry to the lake area)
- 12:32, 22 August 2018 AnaStržen talk contribs uploaded a new version of File:LIFE Strzen project area.jpg
- 12:31, 22 August 2018 AnaStržen talk contribs uploaded File:LIFE Strzen project area.jpg