Uploads by NIVA DK

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
Date Name Thumbnail Size Description Versions
09:44, 4 February 2021 RiverWiki TEST image1.jpg (file) 19 KB River Texas Valley one year after measures implemented, i.e. Aug 2017. Photo: Kari Nordkvinn/NIVA. 4
19:59, 2 February 2021 Monitoring report for Webinar.pdf (file) 151 KB Monitoring report for ecological status 2
15:38, 2 February 2021 Monitoring report NIVA 7485-2020.pdf (file) 61.6 MB Monitoring report of ecological status after daylighting of the Texas Valley stream above the Texas Valley. 1
13:51, 2 February 2021 0515.jpg (file) 5.67 MB Bluebell Feb 6th 2021. 1
12:23, 2 February 2021 RiverWiki TEST image.jpg (file) 19 KB This is just a test. This case will be deleted. 1
14:28, 2 March 2020 Master Thesis David Arnott 2017.pdf (file) 4.48 MB Macroinvertebrate colonisation of a recently deculverted urban stream 1
14:27, 2 March 2020 Masteroppgave Karoline.pdf (file) 4.56 MB Colonisation and Growth of Benthic Algae in a Recently Deculverted Urban Stream 1
14:24, 2 March 2020 Burgess2018 oppgave FINAL.pdf (file) 26.71 MB Development in Phytoplankton Assemblages, Ecological Status and Purification Effect in Teglverksdammen. A Study of a Pond the First Two Growth Seasons Following Deculverting of an Urban Stream System in Oslo, Norway. 1
15:30, 28 February 2020 Akerselva ved Kubaparken 2016 Foto Oslo Kommune BYM.png (file) 451 KB River Akerselva at the Kuba Park in 2016. Photo: Oslo Municipality, Agency for Urban Development. 1
15:06, 28 February 2020 Hovinbekken at Bjerkedalen Park Oslo Norway 2017 Therese Fosholt Moe.JPG (file) 4.47 MB Hovinbekken at Bjerkedalen Park in 2017. Photo: Therese Fosholt Moe / Norwegian Institute for Water Research (NIVA). 1
13:00, 13 January 2020 Teglverksdammen TFM.JPG (file) 4.72 MB Lower stretches of the opened stream channel before the main pond in Teglverksdammen, the first full summer season - 2016. Source: Therese Fosholt Moe / NIVA (Norwegian Institute for Water Research) 1
12:53, 13 January 2020 Borselva.jpg (file) 483 KB A newly opened section of Børselva, including sedimentation pond (far left) and consecutive constructed wetlands. Source: Aanes et al 2016 (NIVA report 6900-2015). 1
12:46, 13 January 2020 Borselva after restoration measures.tif (file) 3.94 MB A newly opened section of Børselva, including sedimentation pond (far left) and consecutive constructed wetlands. Source: Aanes et al 2016 (NIVA report 6900-2015). 1
12:38, 13 January 2020 Rossaga.PNG (file) 1.41 MB Rossåga after the implementation of measures. Source: Øyvind Kanstad-Hanssen (LFI report 296; M-105-2018) 1
12:26, 13 January 2020 Strynevassdraget oxbow lake reconnection.png (file) 726 KB Reconnection of an oxbow lake under a gravel road along the Strynevassdraget. Source: Ole Dag Auflem (https://www.facebook.com/watch/?v=1237244539731489). 1
12:13, 13 January 2020 Bortneelva.png (file) 892 KB Salmon ladder in Bortneelva. Photo: SFE (Sogn og Fjordane Energi). 1
11:55, 13 January 2020 Haukasmeanderet.png (file) 551 KB The artificial meander created at the Haukås wetland. The first batch of freshwater pearl mussels were put out in 2016, with plenty more set out in 2017. Source: Johnsen et al 2018 (Rådgivende biologer report 2629). 1
11:41, 13 January 2020 Mykleelva.png (file) 663 KB Increased water depth in parts of Mykleelva, and added rocks/boulders to improve resting/hiding grounds for fish. Source: Steinar B. Tronhus 2019. 2
11:37, 13 January 2020 Bjornesfjorden.png (file) 984 KB Improved spawning grounds 1 year (top), 3 years (middle) and 11 years after the first addition of spawning ground substrates in Meinbusundet. First addition was in 2002, and additional substrates were put out in 2006. Source: Barlaup et al 2014 (LFI re... 1