User contributions for Tbond
Jump to navigation
Jump to search
24 November 2014
- 15:1015:10, 24 November 2014 diff hist −101 Case study:Enhancement of the River Crouch following a pollution incident No edit summary
- 15:0715:07, 24 November 2014 diff hist +815 Case study:Enhancement of the River Crouch following a pollution incident No edit summary
- 15:0415:04, 24 November 2014 diff hist +886 Case study:Enhancement of the River Crouch following a pollution incident No edit summary
- 15:0415:04, 24 November 2014 diff hist +118 N File:Multiple bough deflector.jpg The deflectors were set at different heights in the water so that they would operate under a range of flow conditions. current
- 15:0115:01, 24 November 2014 diff hist +97 N File:Step4.jpg The final step is to cover the debris with soil and then repair the bank to its former condition. current
- 14:5814:58, 24 November 2014 diff hist +214 N File:Step3.jpg Step three in the deflector installation is to stake and brace the large woody-debris. By linking all the elements together and using screws to fasten the material, the likelihood of structure failure is minimised. current
- 14:5514:55, 24 November 2014 diff hist +97 N File:Step2.jpg The second step in the deflector installation is to lower the large woody-debris into the trench. current
- 14:5414:54, 24 November 2014 diff hist +81 N File:Step1.jpg The first step in the deflector installation was to dig out a trench in the bank. current
- 14:5214:52, 24 November 2014 diff hist −44 Case study:Enhancement of the River Crouch following a pollution incident No edit summary
- 14:3914:39, 24 November 2014 diff hist +1,102 Case study:Habitat enhancement of the River Waveney through Bressingham No edit summary
- 14:3914:39, 24 November 2014 diff hist +125 N File:Brushwood.JPG Brushwood mattresses were built largely by hand and create and excellent refuge for various species, particularly small fish. current
- 14:3614:36, 24 November 2014 diff hist +226 N File:Long reach berm.JPG A long-reach excavator was the perfect tool for the job of working around a fence line. The weight of the machine did cause some minor tracking issues but ensured the required stability when working so close to the river bank. current
- 14:3214:32, 24 November 2014 diff hist +67 N File:Vole mitigation.JPG Prior to works the river banks were checked for water vole burrows. current
- 14:2914:29, 24 November 2014 diff hist +134 N File:Drilling.jpg Timber screws were used to connect the woody-debris to the vertical stakes. The screws are discrete but ensure the structure is solid. current
- 14:2614:26, 24 November 2014 diff hist +88 N File:Drill.JPG High-powered drills were necessary for us to screw some of the wooden features in place. current
- 14:2314:23, 24 November 2014 diff hist +104 N File:Berm feature bressingham.JPG Looking downstream at a berm feature that was installed on the true left-hand bank of the River Waveney. current
- 14:2014:20, 24 November 2014 diff hist +1,350 Case study:Habitat enhancement of the River Waveney through Bressingham No edit summary
- 13:4613:46, 24 November 2014 diff hist +59 N File:Bressingham.JPG Alternating berms on the River Waveney through Bressingham. current
- 13:4013:40, 24 November 2014 diff hist +1,150 N Case study:Habitat enhancement of the River Waveney through Bressingham Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=52.37924775780834, 1.0380707122385502 }} {{Project overview |Project title=Habitat enhancement of the River ..."
- 13:3413:34, 24 November 2014 diff hist +845 Case study:River restoration on the River Brett at Shelley No edit summary
- 13:3113:31, 24 November 2014 diff hist +778 Case study:River restoration on the River Brett at Shelley No edit summary
- 13:2713:27, 24 November 2014 diff hist +610 Case study:River restoration on the River Brett at Shelley No edit summary
- 13:2613:26, 24 November 2014 diff hist +48 N File:Great green.JPG This great green bush cricket was found on-site. current
- 13:2513:25, 24 November 2014 diff hist +104 N File:Water vole search.JPG Mitigation work prior to the start of the project included searching for evidence of water vole burrows. current
- 13:2313:23, 24 November 2014 diff hist +82 N File:Overlooking berm.JPG Matt Holden from the Dedham Vale AONB overseeing the creation of one of our berms. current
- 13:2113:21, 24 November 2014 diff hist +132 N File:Berm feature.JPG A berm feature immediately after construction. This photograph is looking upstream from the true right-hand bank on the River Brett. current
- 13:0913:09, 24 November 2014 diff hist +99 Case study:River restoration on the River Brett at Shelley No edit summary
- 13:0813:08, 24 November 2014 diff hist +1 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 12:2612:26, 24 November 2014 diff hist +222 Case study:River restoration on the River Brett at Shelley No edit summary
- 12:2512:25, 24 November 2014 diff hist +135 N File:Berm scrape.JPG Berm feature incorporating a 'scrape' feature intended to be a refuge for fish fry or to enable the growth of water-loving macrophytes. current
- 12:2212:22, 24 November 2014 diff hist +139 N File:Elongated berm.JPG Looking downstream at an elongated berm feature on the River Brett near Layham. The reworked river bank can be seen on the right-hand side. current
- 12:0912:09, 24 November 2014 diff hist +743 Case study:River restoration on the River Brett at Shelley No edit summary
- 12:0112:01, 24 November 2014 diff hist +170 N File:Gravel shoulders.JPG Gravel shoulders created using material excavated from a newly created pool. Note how the flow is visibly quicker where the channel is constricted by the gravel features. current
- 11:5711:57, 24 November 2014 diff hist +1,136 N Case study:River restoration on the River Brett at Shelley Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=52.034680566837565, 0.9590850211679935 }} {{Project overview |Project title=River restoration on the River B..."
- 11:4911:49, 24 November 2014 diff hist +895 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:4511:45, 24 November 2014 diff hist +783 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:3511:35, 24 November 2014 diff hist +994 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:3511:35, 24 November 2014 diff hist +181 N File:Deflector comp.jpg Flow deflector combined with pool excavation to increased habitat diversity. Willow spillings and branches have been included to provide shelter for juvenile fish and invertebrates. current
- 11:3211:32, 24 November 2014 diff hist +135 N File:Soft berm.JPG A berm made of soft bed material and reed vegetation. This feature has narrowed the active channel and increased flow velocity locally. current
- 11:2911:29, 24 November 2014 diff hist +84 N File:Team photo.JPG Some of the Environment Agency staff involved with the implementation of the scheme. current
- 11:2711:27, 24 November 2014 diff hist +112 N File:Composite berm 2.JPG A second composite berm. In this instance the stakes that are inserted vertically into the river bed can be see. current
- 11:2511:25, 24 November 2014 diff hist +198 N File:Composite berm.JPG Composite berm consisting of a downstream flow deflector back-filled with spoil material taken from the originally over-steep embankment. The wooden toe adds stability and protection to the feature. current
- 11:1511:15, 24 November 2014 diff hist +133 N File:DS flow deflector.jpeg Downstream facing flow deflector with small spoil backfill on the true left-hand bank of the River Brett, upstream of Shelley Bridge. current
- 11:1211:12, 24 November 2014 diff hist −8 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:1211:12, 24 November 2014 diff hist +384 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:0511:05, 24 November 2014 diff hist 0 File:River Brett flow deflector.jpeg Tbond uploaded a new version of "File:River Brett flow deflector.jpeg": A flow deflector on the River Brett upstream of Shelley Bridge. current
- 11:0411:04, 24 November 2014 diff hist +138 Case study:Rehabilitation of the River Brett at Shelley, Suffolk No edit summary
- 11:0311:03, 24 November 2014 diff hist +89 N File:River Brett flow deflector.jpeg One of the wooden flow deflectors installed on the River Brett upstream of Shelley Bridge
- 10:5510:55, 24 November 2014 diff hist +1,166 N Case study:Rehabilitation of the River Brett at Shelley, Suffolk Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=52.00729081338846, 0.9589948737993836 }} {{Project overview |Project title=Rehabilitation of the River Brett..."
10 May 2013
- 09:3409:34, 10 May 2013 diff hist +29 Case study:River restoration and flood alleviation on the River Brain at Witham No edit summary