User contributions for Huw Jones
Jump to navigation
Jump to search
28 November 2018
- 17:1517:15, 28 November 2018 diff hist +129 Case study:Ddu Restoration Project No edit summary current
- 17:1517:15, 28 November 2018 diff hist +51 N File:2016SectionAfterdownstream.JPG 2016 section, looking downstream, after restoration current
- 17:1317:13, 28 November 2018 diff hist +65 N File:2016SectionBeforedownstream.JPG Section restored in 2016 - looking downstream, before restoration current
- 17:0917:09, 28 November 2018 diff hist +63 Case study:Ddu Restoration Project No edit summary
- 17:0917:09, 28 November 2018 diff hist +44 N File:2016RestoredSectionbefore.JPG 2016 Work section before boulder replacement current
- 16:5616:56, 28 November 2018 diff hist +34 Case study:Ddu Restoration Project No edit summary
- 16:5516:55, 28 November 2018 diff hist +63 Case study:Ddu Restoration Project No edit summary
- 16:5516:55, 28 November 2018 diff hist +28 N File:Phase 5 works summary.pdf Phase 5 works summary (2015) current
- 13:0713:07, 28 November 2018 diff hist +115 Case study:Ddu Restoration Project No edit summary
- 13:0713:07, 28 November 2018 diff hist +99 N File:2016RestoredSection.JPG Restored section from 2016 where boulders were replaced and clean gravel reintroduced to the river. current
- 13:0613:06, 28 November 2018 diff hist +129 N File:Gravelreintroduction.JPG Clean gravel being gradually introduced into the river using an improvised visqueen chute arrangement (Upper River Section 2015). current
27 November 2018
- 20:0920:09, 27 November 2018 diff hist +57 Case study:Ddu Restoration Project No edit summary
- 20:0920:09, 27 November 2018 diff hist +119 N File:Restoredsection2006.jpg Restored section. Note significantly raised river bed level compared with image showing the same section post dredging. current
- 19:3619:36, 27 November 2018 diff hist +139 Case study:Ddu Restoration Project No edit summary
- 19:3219:32, 27 November 2018 diff hist +3 Case study:Ddu Restoration Project No edit summary
- 19:2919:29, 27 November 2018 diff hist +17 Case study:Ddu Restoration Project No edit summary
- 19:2819:28, 27 November 2018 diff hist +121 Case study:Ddu Restoration Project No edit summary
- 19:2619:26, 27 November 2018 diff hist +115 Case study:Ddu Restoration Project No edit summary
- 19:2619:26, 27 November 2018 diff hist +44 N File:Partialbarrierameliorated.JPG Partial barrier following amelioration work. current
- 19:2619:26, 27 November 2018 diff hist +58 N File:Partialbarrier.JPG Partial barrier to salmonid migration before amelioration. current
- 19:1719:17, 27 November 2018 diff hist +224 Case study:Ddu Restoration Project No edit summary
- 19:1719:17, 27 November 2018 diff hist +208 N File:2009Restored section.JPG Image of the restored section from 2009. Note absence of finer substrate which tends to be associated with suitable Margaritifera margaritifera habitat, and is indicative of gravel starvation in the Afon Ddu. current
- 19:1219:12, 27 November 2018 diff hist +66 N File:Sept2005-after.jpg Image showing section with boulders and sediment placed in channel current
- 19:1119:11, 27 November 2018 diff hist +63 N File:Sept2005-before.jpg Damaged section in 2005 before boulder and sediment replacement current
- 19:0819:08, 27 November 2018 diff hist +39 N File:Sept2005-machineworking.jpg Phase 1 restoration from September 2005 current
- 19:0519:05, 27 November 2018 diff hist +56 Case study:Ddu Restoration Project No edit summary
- 19:0519:05, 27 November 2018 diff hist +37 N File:1996damagedsection.jpg Further image of the damage from 1996 current
- 19:0319:03, 27 November 2018 diff hist +56 Case study:Ddu Restoration Project No edit summary
- 19:0319:03, 27 November 2018 diff hist +74 N File:1996dredgingdamage.jpg Image of the river from 1996 showing damage caused by dredging operations. current
- 18:5918:59, 27 November 2018 diff hist +106 N File:1996 Post Dredging.jpg Image of the river in 1996 showing damage following dredging operations. (National River Authority image). current
- 17:3517:35, 27 November 2018 diff hist +703 Case study:Ddu Restoration Project No edit summary
- 17:2517:25, 27 November 2018 diff hist +327 Case study:Ddu Restoration Project No edit summary
- 17:2317:23, 27 November 2018 diff hist +29 Case study:Ddu Restoration Project No edit summary
- 17:1817:18, 27 November 2018 diff hist +412 Case study:Ddu Restoration Project No edit summary
- 17:0717:07, 27 November 2018 diff hist +2,135 Case study:Ddu Restoration Project No edit summary
- 16:4316:43, 27 November 2018 diff hist +177 N File:Restoration2016.JPG Restoration by replacing boulders and gravel reintroduction of the mid section of the Afon Ddu through work funded by Natural Resources Wales in co-operation with the landowner. current
- 16:3516:35, 27 November 2018 diff hist +1,138 N Case study:Ddu Restoration Project Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=52.96024856884791, -4.141320961354495 }} {{Project overview |Project title=Ddu Restoration Project |Status=I..."
- 16:3116:31, 27 November 2018 diff hist +164 User:Huw Jones No edit summary current