Case study:Wickes – Harford retail site

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 26' 33.70" N, 0° 1' 35.02" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Economic aspects, Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity
Country England
Main contact forename Dave
Main contact surname Webb
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Deculvert River; provide walk as part of water link way; river edge planting; re-meandering. Channel currently within culvert under car park. Deculverting removes fish blockage and enhances habitat.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Ravensbourne (Catford to Deptford)
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 132132 m <br />0.132 km <br />13,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Urban
Waterbody ID GB106039023270



Other case studies in this subcatchment: Broadway Fields/ Seagers Distillary, Catford Greyhound Stadium, Cornmill Gardens (QUERCUS), Ladywell Fields (QUERCUS), Ladywell Fields Phase 2, Ladywell Fields to Cornmill Gardens, Ladywell Fields toeboarding, Lewisham College weir, Linear Park, QUERCUS Ravensbourne... further results


Site

Name
WFD water body codes GB106039023270
WFD (national) typology
WFD water body name Ravensbourne (Catford to Deptford)
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 100 m0.1 km <br />10,000 cm <br />
Project started 2008/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources S106 agreement

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration
Hydromorphology Continuity for organisms
Biology Fish
Physico-chemical
Other reasons for the project Recreation


Measures

Structural measures
Bank/bed modifications Deculverting
Floodplain / River corridor Tree management
Planform / Channel pattern Creation of meanders
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Improved public access
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information