Case study:Wellow Brook Habitat Enhancement Project

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 17' 26.26" N, 2° 29' 7.53" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://http://www.bristolavonriverstrust.org/the-wellow-brook-project/
Themes Environmental flows and water resources, Fisheries, Habitat and biodiversity, Social benefits
Country England
Main contact forename Harriet
Main contact surname Alvis
Main contact user ID User:H.alv
Contact organisation Bristol Avon Rivers Trust
Contact organisation web site http://www.bristolavonriverstrust.org
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The aims of the project were: •To draw attention to the brook and to highlight how local people could make a difference in maintaining it and improving it in the future, whilst also making some improvements to the brook. •To open up the river by coppicing a short stretch which would be immediately noticeable to local residents and to provide views along the brook which were previously hidden. This would also allow extra light into the brook and along it’s bankside to promote plant growth and increase the productivity of the river. •To construct in-stream woody structures along the newly cleared stretch to introduce some variability to the flow pattern of the brook within its natural banks. It was intended that these structures would also act as refuges and habitats for juvenile fish, including the small numbers of brown trout present in the area. •To patch areas of bank erosion along the site using natural woody materials. • To investigate other areas of the river for the future to offer ongoing solutions and opportunities for local people and the local authorities to continue improvement and maintenance of the town’s most valuable natural asset.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Gravelled access ramp
One of the brushwood berm structures
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Wellow Brook
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2015/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Overshading
Hydromorphology
Biology Fish, Fish: Abundance, Habitat variability
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern Introducing large woody debris, Brushwood berms to increase scour on the gravels, Habitat creation, Creation of fish refuge areas, Cut back of trees
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.somersetguardian.co.uk/Work-improve-brook-lead-area-rich-wildlife/story-25976978-detail/story.html Press coverage

Supplementary Information

Edit Supplementary Information