Case study:Unit 3a – Hurst Bridge 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.environment-agency.gov.uk |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Alastair |
Main contact surname | Maxwell |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The main River Frome Unit 3a flows mostly through the Moreton Estate. This reach in particular is downstream of the Hurst road bridge. It was historically part of an old mill system and the reach retains a fixed crest weir at the location of the former mill. Removal of the weir was discounted early on due to costs and possible impacts on the road bridge. Works were concentrated on the reach between the bridge and the weir looking to improve the channel and bank structure and creating a greater range of habitats in particular for fish.
The River Frome Rehabilitation Plan states the main proposals to improve the SSSI condition and WFD objectives of Unit 3a and to incorporate as part of the Hurst Bridge Project are: a) increase / diversify channel bed profile creating deep pools and gullies and b) to introduce large woody debris to provide in channel habitat and vary bed profiles through scour and deposition.
Monitoring surveys and results
Lessons learnt
This project did pose some issues during its delivery. The extent of the berm creation and bed reprofiling was limited due to the presence of overhead power lines. A safe working method was implemented by the Ops Delivery team. Initially the excavator to be used had an 8m reach; this was also used on the North Channel job. However this reach was wider and to maximise the benefits of the project a long reach had to be brought to site. This came at additional cost but enabled effective delivery of the project. The long reach machine was also used on a few parts of the North Channel project which were out of reach form the original machine. The tree works described above were also able to be carried out with the larger machine.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: 2e Lower Woodsford River and Floodplain Enhancement, Bockhampton Enhancement, Hurst Bridge (downstream), Louds Mill (Downstream)m Enhancement, Lower Bockhampton, Lower Woodsford, Martins River Island, Moreton Channel Gravel Reprofiling, North Channel Upper Reach, River Frome Rehabilitation Plan... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|