Case study:Taw River Improvement Project – Taw Access over Weirs

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 44' 13.02" N, 3° 55' 7.68" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Economic aspects, Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Monitoring, Social benefits, Water quality
Country England
Main contact forename Dylan
Main contact surname Bright
Main contact user ID
Contact organisation Westcountry Rivers Trust
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The weir at North Wyke

Project summary

Edit project overview to modify the project summary.


TRIP is a partnership project that will use CRF funds to manage restoration work to deliver habitat improvements in the Taw catchment. The partnership, led by the Westcountry Rivers Trust, has been carrying out river restoration and addressing the causes of Water Framework Directive issues together for many years.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district South West
River basin North Devon

Subcatchment

River name Taw (Source to Bullow Brook)
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 601601 m <br />0.601 km <br />60,100 cm <br />
Dominant geology Siliceous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB108050008250



Site

Name
WFD water body codes GB108050008250
WFD (national) typology
WFD water body name TAW
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2012/07/01
Works started
Works completed
Project completed 2015/03/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident, Riparian development
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Bank reprofiling, Reduce diffuse pollution
Floodplain / River corridor Barrier removal
Planform / Channel pattern Diversification of in-channel features
Other
Non-structural measures
Management interventions Fencing, Non/agricultural business changed its way of working
Social measures (incl. engagement) Community involvement
Other Monitoring and survey projects


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information