Project overview

Edit project overview
Status In progress
Project web site http://www.warwickshirewildlifetrust.org.uk/sowe-valley-project
Themes Social benefits, Water quality
Country England
Main contact forename Anna
Main contact surname Squires
Main contact user ID
Contact organisation Warwickshire Wildlife Trust
Contact organisation web site http://www.warwickshirewildlifetrust.org.uk
Partner organisations Coventry City Council, Environment Agency, BKW Housing Consortium
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The Sowe Valley Project is a community based river restoration project, working with local communities along an 8 1/2 mile stretch of the River Sowe in Coventry to help improve it for both people and wildlife. The project, with local volunteers deliver the following work along the valley: 1) himalayan balsam control 2) mink monitoring 3) removal of polluting items from the channel 4) bank side vegetation work to improve light and shade levels in the river 5) bank side planting of native species. The project has at least 4 volunteer days per month - see the website for full details. The Sowe Valley project has also supported the formation of the Friends of Sowe Valley, a voluntary group set up to keep the river conservation work going after the project funding ends.

The Sowe Valley Project has received £211,512 of funding from Natural England’s Access to Nature Programme, funded by £25m from the Big Lottery Fund’s Changing Space programme. The project has also received funding from the Environment Agency, BKW housing consortium and kind donations from Warwickshire Wildlife Trust members. It is also supported by Coventry City Council.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Severn
River basin Warwickshire Avon

Subcatchment

River name R Sowe - conf Smite Bk to conf R Avon
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 106106 m <br />0.106 km <br />10,600 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB109054044540



Site

Name Sowe Valley
WFD water body codes GB109054044660 and GB109054044550
WFD (national) typology
WFD water body name River Sowe
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest Water Vole, otter (Lutra lutra)
Dominant hydrology
Dominant substrate
River corridor land use Urban, Improved/semi-improved grassland/pasture
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 1370013,700 m <br />13.7 km <br />1,370,000 cm <br />
Project started 2009/10/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Natural England, Big Lottery, Environment Agency, BKW Housing Consortium, Warwickshire Wildlife Trust Members

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.facebook.com/#!/pages/Sowe-Valley-Project/132893750072998 Sowe Valley Facebook Page