Case study:River Shuttle Enhancement Works - Malborough Park

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 26' 26.36" N, 0° 6' 13.05" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country England
Main contact forename Bob
Main contact surname Smith
Main contact user ID
Contact organisation London Borough of Bexley
Contact organisation web site
Partner organisations Royal HaskoningDHV
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


To move the channel away from residential property and create a low flow channel with diverse marginal habitat and small offline wetland habitat. The River Shuttle through Marlborough Park had extensive bank erosion that was beginning to encroach on the back of residents gardens.
First Phase Complete 2010, Next Phase underway later 2011

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


P1000310.JPG
P1040950.JPG
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin Darent

Subcatchment

River name Shuttle
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 106106 m <br />0.106 km <br />10,600 cm <br />
Dominant geology Siliceous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106040024210



Other case studies in this subcatchment: Hollyoak Wood and Willersley Park, Parish Wood Park, River Shuttle Enhancement Works - Love Lane


Site

Name
WFD water body codes GB106040024210
WFD (national) typology
WFD water body name Shuttle
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 115 m0.115 km <br />11,500 cm <br />
Project started 2010/01/01
Works started
Works completed 2011/01/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources London Borough of Bexley

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Urbanisation
Hydromorphology Quantity & dynamics of flow
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Creation of wetland
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information