Case study:Markeaton and Mackworth Brook (MMB) Project

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 56' 19.58" N, 1° 32' 3.84" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Fisheries, Habitat and biodiversity, Land use management - agriculture, Water quality
Country England
Main contact forename Angela
Main contact surname Mayson
Main contact user ID User:Jfreeborough
Contact organisation Environment Agency
Contact organisation web site http://https://www.gov.uk/government/organisations/environment-agency
Partner organisations National Trust
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Improvement works

Project summary

Edit project overview to modify the project summary.


To carry out work to prevent diffuse pollution. The MMB Project is led by the National Trust who have undertaken significant investigations and actions to date working with farmers and landowners in the area to improve practices to improve water quality outcomes for the brooks. These activities have included installing fences and cattle drinking areas to reduce the cattle poaching and discharges of phosphate to the brooks.

The Mackworth Brook is failing to achieve Water Framework Directive good ecological status due to, amongst other things, diffuse pollution from agriculture.

The Environment Agency and the National Trust are continuing to work together to enable further works to be undertaken along the Mackworth Brook.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Environment Agency funding has paid for 1.3 km of bankside fencing, 6 cattle drinking areas and a pasture pump. This will restrict livestock access to the brook and will help improve water quality. There will be reduced sediment and phosphate flows into Mackworth Brook, reduced floods flows to the Derwent, improved amenity at the site and an education tool for SuDs.

Lessons learnt

Edit project overview to modify the lessons learnt.


Increased knowledge for farming community in the area and less cattle poaching and phosphate inputs.

Sharing of knowledge for best practice and innovative solutions has been useful across the catchment.


Image gallery


Before works
Poaching
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Humber
River basin Derbyshire Derwent

Subcatchment

River name Mackworth Brook from Source to Markeaton Brook
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 149149 m <br />0.149 km <br />14,900 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB104028052840



Site

Name
WFD water body codes GB104028052840
WFD (national) typology
WFD water body name Mackworth Brook from Source to Markeaton Brook
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 830830 m <br />0.83 km <br />83,000 cm <br />
Project started 2016/04/01
Works started
Works completed
Project completed 2017/03/31
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Cattle drinkers, Livestock fencing
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Work with farmers and land managers


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information