Case study:Hoveton Wetlands Restoration Project

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 42' 53.18" N, 1° 24' 43.08" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology, Water quality
Country England
Main contact forename Rory
Main contact surname Sanderson
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Hoveton Great Broad is situated between the villages of Hoveton and Horning, immediately adjacent to the River Bure in the heart of the Broads. It is designated under the Habitats and Birds Directives and the RAMSCAR Convention on Wetlands of International Importance. The lake has poor plant growth and excessive sediment deposits. This acts as a source of phosphorus which causes algal growth and poor ecology. The quality of the river water has improved over recent years and is now able to support the lake restoration. None of the 21 lakes in the Broadland catchment meet good WFD status. This project will help inform future lake measures in this internationally important wetland.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Technically robust information will be available to inform the Hoveton Wetlands Restoration Project, increased understanding of the wider implications of the project on Broad fisheries status as a whole. Benefits include angler participation and support for the restoration projects. The objectives are to significantly improve the condition of the lake by creating clear water conditions in which a variety of plants and animals thrive. NE are leading on an ambitious £4.5m project funded by LIFE+ and Heritage Lottery Fund to undertake sediment removal and biomanipulation of the fish populations with the aim of resorting the lake to good status including for fish. Our aim is to support our partners in this project, add to our understanding of Broadland fisheries, and shallow lake restoration measures.

Lessons learnt

Edit project overview to modify the lessons learnt.


We can provide data to NE to support and inform restoration works. We will continue to work with partners to improve WFD status.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes GB30535977
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design more than 10000 k€ 1400014,000 k€ <br />14,000,000 € <br />
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information