Case study:Dysart Park, Grantham Habitat Improvement

From RESTORE
Revision as of 14:35, 8 February 2024 by Dhutchinson (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 54' 10.45" N, 0° 37' 44.31" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country England
Main contact forename Gail
Main contact surname Hutchinson
Main contact user ID
Contact organisation East Mercia Rivers Trust
Contact organisation web site http://Environment%20Agency
Partner organisations Environment Agency
Parent multi-site project

Upper Witham Restoration

This is a parent project
encompassing the following
projects
No
Project after establishment and naturalisation.

Project summary

Edit project overview to modify the project summary.


The Upper Witham is the ground water fed headwaters of the Witham supporting important species including Native Crayfish and Brown Trout. Historic changes to the river for milling and land drainage have however degraded habitat especially in urban areas such as Grantham.

The project aimed to restore habitat in an over widened, shaded section of river running alongside a public park in the town. This was done by hinging trees to form berms which helped to narrow the channel and provide lighter. As well as benefiting the habitat, this made the river more visible to near-by residents and park users.

This work reduced the need for EA maintenance of the trees in this section of river.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

Edit project overview to modify the lessons learnt.


Plan ahead where native Crayfish could be impacted by a project. Ensure you have the necessary permissions to survey for them and where necessary relocate from the project site.

This project also planned to install a rock ramp on a weir downstream, but this could not be taken forward due to site access during Covid.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information