Case study:River Wensum Restoration, Reach 9 Attlebridge

From RESTORE
Revision as of 08:46, 1 March 2023 by Amy.butcher (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 42' 40.31" N, 1° 8' 42.97" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Amy
Main contact surname Butcher
Main contact user ID User:Amy.butcher
Contact organisation Environment Agency
Contact organisation web site http://gov.uk/environment-agency
Partner organisations
Parent multi-site project

River Wensum Restoration Strategy

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


This scheme is part of implementation of the River Wensum Restoration Strategy (RWRS). The River Wensum in Norfolk is nationally and internationally important for wildlife. The Attlebridge scheme (Unit 53, Reach 9 and part of Reach 8 from the feasibility studies) covers 1.3km of channel, from Marriott’s Way downstream to the A1067 Fakenham Road Bridge. The key existing conditions which influenced the restoration measures included bank erosion, lack of bankside tree cover, lack of in-channel woody material and limited off-channel refuge areas. The scheme includes the installation of woody material features to help stimulate variation in the flow regime and help restore the natural form and function of the channel. On areas of riverbank showing signs of erosion and cattle poaching we have re-profiled the riverbank to provide a gentler more natural bank angle encouraging wetland marginal vegetation to establish. ‘Reject’ and smaller gravel material has been used to reduce the impact of cattle poaching on sediment mobilisation. Backwater refuge areas have been created by re-connecting an existing field drain. Shallow fry refuge habitat was also achieved by re-excavating an existing shallow open area at the confluence of the drain and river such that it was able to be inundated by water from the river again. Additional fry refuge habitat was also created adjacent to an existing ford crossing. Aside from the very downstream end of the reach, the river corridor was largely devoid of trees. We have planted 130 native wetland species along the reach which will, in the long-term, improve bank stability, create a diversity of light and shade conditions and provide a potential source of woody material to the river, improving physical habitat and providing cover for fish.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

Edit project overview to modify the lessons learnt.


Felled poplar trees provided locally won woody material but required substantial fixings to prevent their movement due to the porous and buoyant nature of the wood.

Cattle were observed to avoid the reject gravel ford crossing and walk across the existing softer bed material, causing erosion and mobilising silt. Formal cattle crossing designs and drinking points need fencing to prevent livestock from choosing their own routes.


Image gallery


Riffle.JPG
AttlebridgeWoodyMaterial.JPG
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Broadland Rivers

Subcatchment

River name Wensum US Norwich
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 9898 m <br />0.098 km <br />9,800 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105034055881



Other case studies in this subcatchment: Great Ryburgh End Restoration Scheme, Meander reinstatement on the River Wensum at the Ryburgh Loop, River Wensum Restoration, Reach 10 Lenwade, River Wensum Restoration, Reach 3a Costessey, River rehabilitation on the River Wensum at Swanton Morley, Sculthorpe Moor Restoration Scheme, Wensum River Restoration and Floodplain Enhancement, Wensum River Restoration and Floodplain Enhancement, Pensthorpe


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information