Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Water quality
Country England
Main contact forename Tracey
Main contact surname Doherty
Main contact user ID User:TameValley
Contact organisation Warwickshire Wildlife Trust
Contact organisation web site http://www.tamevalleywetlands.co.uk/
Partner organisations
Parent multi-site project

TameValley

This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


To restore 520 metre length of the River Tame – re-naturalising the river and improving access for people.

Natural Environment Restoration - The project will restore natural river processes to the River Tame along the eastern edge of Kingsbury Water Park by altering the profile of the current incised river banks and widening the river. This will allow the natural development of riffles which will not only improve habitat but also increase aeration of the Tame and thus water quality. Spoil will be used in Hemlingford Water to shallow the eastern and northern edges, where a reedbed (a BAP priority habitat) will be created separately through Warwickshire County Council’s Higher Level Stewardship agreement (HLS), to increase biodiversity and prevent erosion at the edge of the lake from boat wash.

Improved Access - The re-profiling work will enable walkers using the footpath between Hemlingford Water and the River Tame to see the river which is at present hidden by a mound of dredgings. Access will be created on the left bank and improved on the right bank of the river. There will also be improved safety for locals who swim/paddle in the river.

A ramp will be created (from the spoil) to allow access from the raised walkway at the northern end of the site to the right bank of the river. This will create a circular walk along both banks of the Tame between the two bridges.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


  • WFD Baseline data
  • Fixed point photos before and after
  • Aerial photos before and after
  • river profile survey taken before

Bioblitz identified good fish stock eg lots of predatory fish. Lots of Bullhead, an LBAP species which is sensitive to water quality and European Eel a protected species.

Botanical survey showed natural regeneration of floodplain meadow indicator species eg Greater Burnett.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2005
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Channel reprofiling, Riffle creation, Habitat restoration
Floodplain / River corridor New footpaths
Planform / Channel pattern Channel widening, Reedbed creation
Other Improving water quality
Non-structural measures
Management interventions
Social measures (incl. engagement) Improved public access
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information