Case study:Kentchurch Weir Removal

From RESTORE
Revision as of 14:54, 2 January 2019 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 55' 25.48" N, 2° 51' 0.57" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country England, Wales
Main contact forename Peter
Main contact surname Gough
Main contact user ID
Contact organisation Natural Resources Wales
Contact organisation web site
Partner organisations Atkins
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The 2 metre high Kentchurch Weir, prior to removal. Courtesy of Atkins.

Project summary

Edit project overview to modify the project summary.


In 2008, EA Wales and Atkins completed a project to install a fish pass at Osbaston, downstream of Kentchurch Weir - to improve fish passage upstream. However, the 2 metre high Kentchurch Weir posed as a significant and impassable barrier to fish passage further upstream. A £100,000, 18 month-long project was undertaken, beginning in 2008, to remove this structure and open up the upper reaches of the Monnow.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


KENTCHURCH PRE.jpg
KENTCHURCH POST.jpg


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Severn
River basin Wye

Subcatchment

River name R Monnow - conf Afon Honddu to conf R Wye
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 423423 m <br />0.423 km <br />42,300 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB109055029720



Other case studies in this subcatchment: River Monnow (Going Native)


Site

Name Monnow at Kentchurch Weir
WFD water body codes GB109055029720
WFD (national) typology Mid, Medium, Calcareous
WFD water body name R Monnow - conf Afon Honddu to conf R Wye
Pre-project morphology High width:depth. Significant backwater upstream of impoundment.
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started 2011/08/01
Works completed 2012/08/15
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 120120 k€ <br />120,000 € <br />
Benefit to cost ratio
Funding sources UK European Fisheries Fund Operational Programme

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Good ecological status, but weir removal to improve fish passage to upper reaches. Also, to improve habitat for macrophytes and macroinvertebrates.
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Weir removal, Weir modification
Floodplain / River corridor Improving fish migration
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Bathymetric Survey Yes No No Yes No
Sediment Contamination Assessment Yes No No Yes No


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information

Considered to be the largest ever weir removal undertaken in Wales. Removal has allowed 160km of the Monnow catchment to be restored to its natural condition of flow and connectivity.