Case study:Barn Elms Wetland Centre, South West London

From RESTORE
Revision as of 12:21, 2 January 2019 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
5.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 28' 42.97" N, 0° 13' 58.14" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits, Urban
Country England
Main contact forename Kevin
Main contact surname Peberdy
Main contact user ID
Contact organisation Wildfowl and Wetlands Trust
Contact organisation web site http://www.wwt.org.uk/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Work undertaken:
- Wetland habitat creation
- reedbed and lake creation
- on-going monitoring
- access and amenity, visitors centre.

Housing development provided the opportunity to create major new wetland habitat on the site of former waterworks. The new centre is a good example of how the development and planning process can lead to habitat enhancement on a significant scale. The 43 hectare London Wetland Centre is the best urban site in Europe to watch wildlife, an international award winning visitor attraction and a Site of Special Scientific Interest (SSSI).

View the Map of the site here - https://magic.defra.gov.uk/MagicMap.aspx?startTopic=Designations&activelayer=sssiIndex&query=HYPERLINK%3D%272000457%27

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 172172 m <br />0.172 km <br />17,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106039022850



Other case studies in this subcatchment: Anton Crescent Wetlands Regeneration, Ashlone Wharf FCRM scheme, Barn Elms Sports Ground, Barnes Common, Barnes Common improvements, Beverley Brook Flow control structures, Beverley Brook d/s of Rock’s Lane, Beverley Park, Cuddington Park, Horne Way Weir... further results


Site

Name
WFD water body codes GB106039022850
WFD (national) typology
WFD water body name Beverley Brook (Motspur Park to Thames) and Pyl Brook at West Barnes
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Reedbed creation, Creation of a lake, Wetland habitat
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Visitor centre, Community Education, Public amenity and perception, Improved public access
Other Monitoring and survey projects


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information