Case study:R Derwent Abutment & Buttress Removal

From RESTORE
Revision as of 10:43, 10 July 2018 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 54° 39' 38.42" N, 3° 28' 49.23" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://westcumbriariverstrust.org
Themes Hydromorphology
Country England
Main contact forename Ian
Main contact surname Creighton
Main contact user ID
Contact organisation West Cumbria Rivers Trust
Contact organisation web site http://westcumbriariverstrust.org
Partner organisations Natural England & Environment Agency
Parent multi-site project

Cumbria River Restoration Strategy

This is a parent project
encompassing the following
projects
No
Old railway crossing prior to demolition

Project summary

Edit project overview to modify the project summary.


Abandoned railway criss crossed the R Derwent at three locations at this vicinity. The failing abutments and buttresses were removed summer 2013 to improve stream hydrology and morphology.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


River morphology recovering well. No negative impacts from subsequent major flood events including 'Storm Desmond' December 2015

Lessons learnt

Edit project overview to modify the lessons learnt.


Undertake a Level 2 archaeological survey prior to demolition Ensure landowners and fishery owners are on board in the early stages Evaluate likely channel impacts from proposed modifications prior to demolition so no significant supprises


Image gallery



ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name River Derwent
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Removal of bank reinforcements
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information