Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 46' 54.79" N, 1° 47' 30.27" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.hampshireavoncatchmentpartnership.org.uk/
Themes Fisheries, Habitat and biodiversity
Country England
Main contact forename Leanne
Main contact surname Sargeant
Main contact user ID User:H
Contact organisation
Contact organisation web site http://www.wcsrt.org.uk
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The project improved habitat for: • water meadow and wetland botanical and invertebrate communities • wading birds by improving the wetted area in adjoining fields • nesting song birds in new, very low-growing, bankside willow cover • helped trap sediment and nutrients on water meadows and within enhanced ditch systems • better wetting of water meadow systems will help buffer flood peaks on the lower Avon • Eels: improved connectivity with the floodplain and enhanced ditch systems By cleaning spawning riffles the abundance of benthic macro-invertebrates and associated fly life will increase within project areas. This will have a knock-on benefit of better food provision for fish, riparian birds and bats.

The Lower Avon Project at Avon Tyrell was completed using funding from CPAF. A total of 29 large woody debris and live hinged willows were added to the channel to encourage diversified flows and cover for Salmonids and other fish species. The 100m2 of gravel cleaning and 50m2 of cover habitat for fry and Parr were carried out. The project has created 3 backwaters at least 0.5m deep with shallow profiled margins, creating a total of 500m2 of new habitat.

The Salmonid Riffle improvements on the Nadder and Wylye involved 6 sites which were improved by the Partnership as part of this CPAF funding, with a further 3 riffles improved as part of other schemes going ahead in 2015/16. The project enhanced 300m2 of riffle gravel salmonid spawning habitat at 9 sites and created 150m2 of cover habitat for parr and fry downstream of the works.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Fish using new woody habitat at Avon Tyrell. Salmon redds on new riffles and cleaned gravels. Monitoring of juvenile fish using fry bays. Presence of coarse fish fry in fry bays. Presence of waders. Fixed point photography to show the changes made by the project. This monitoring will all help with future delivery of projects and give us demonstration sites we can show to angling clubs and landowners. The only monitoring that was not able to take place were the red counts as the weather was too severe, making the water too muddy and clouded to be able to undertake surveys.

Lessons learnt

Edit project overview to modify the lessons learnt.


The collaborative working went very well, especially with building in a monitoring plan through collaboration with other Catchment Partners. The project gave some good case studies that can be used in conjunction with other angling clubs to get them delivering some of the same types of projects on other reaches in the catchment.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information