Case study:Dorset CPAF Projects
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Habitat and biodiversity, Land use management - agriculture, Monitoring, Social benefits, Water quality |
Country | England |
Main contact forename | Jacob |
Main contact surname | Dew |
Main contact user ID | User:DorsetWR |
Contact organisation | Dorset Wildlife Trust |
Contact organisation web site | http://www.dorsetwildlifetrust.org.uk |
Partner organisations | FWAG SW, Kingston Waurward College, Wessex Chalk Streams and Rivers Trust, Litter Free Coast and Sea, Dorset Coastal Forum, Bournemouth Borough Council |
This is a parent project encompassing the following projects |
Dorset CPAF Projects |
Project summary
Then Dorset Wildlife Trust CPAF projects delivered results through a series of specific projects, tailor-made for issues found on the ground across Dorset in a variety of locations.
Projects on the Stour linked to the receptor coastal water bodies as well as supporting refuges for coarse fish populations . Projects on the Corfe show proactive work and how small scale land management projects can benefit the water course. Projects on the Frome were linked to existing restoration plans and will engage with farmers of the future.
Frome (lower) - This project enhanced the wildlife value of the floodplain and slowed the flow of water with simple water control structures. Complementary works to increase light to ordinary watercourses through tree management and in channel enhancements to benefit fish interest were also undertaken. The project improved the floodplains link to the river and increased nutrient loading capacity.
The Corfe River - In 2014, FWAG SW undertook a scoping study of the waterbody to identify problems, restoration habitat opportunities (both in-channel and on adjacent riparian habitat) and potential land management change opportunities. From this, some simple and quick-win restoration projects were identified to help reduce bank erosion, create marginal habitat, and increase light to the watercourse. Pasture pumps and drinking troughs have been installed, Drinking bays fenced off, River margins fenced and Trees crowned to let light in and promote marginal vegetation growth.
Bourne Stream - Only Rain Down The Drain; A solution was needed to help Bournemouth town centre businesses (specifically food outlets to tackle the issues of surface water contamination leading to negative impacts on bathing water quality. The project focussed on improving understanding of what can and cannot be poured down surface water drains, the negative impact pollutants put into the drain can have on bathing water quality directly and the wider social and economic impacts to the area if poor bathing water quality is recorded at Bournemouth beaches. Businesses were motivated to change behaviour around surface water drains so that only rain goes down the drain.
Tarrant: The project is trialling techniques to successfully establish wetland plant/meadow communities in high nutrient conditions. The project will develop a bespoke species rich floodplain grassland/meadow seed mix and sow in a floodplain with the seed bank, soil fertility, site hydrology and ecology monitored over a 5yr period.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|