Project overview

Edit project overview
Status In progress
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Becky Gray
Main contact surname & Olly Southgate
Main contact user ID
Contact organisation Natural England & Environment Agency
Contact organisation web site
Partner organisations Eden Rivers Trust, West Cumbria Rivers Trust, South Cumbria Rivers Trust
This is a parent project
encompassing the following
projects
Bowston Weir Removal, Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria, Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria, Removing Sheepmount weir, River Caldew, Carlisle, Cumbria, River Leith Restoration Project, Thrimby, Penrith, Cumbria, River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria, Swindale Beck Restoration, Whit Beck River Restoration Project
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Cumbria River Restoration Strategy was developed to help deliver the joint Natural England and Environment Agency obligation to improve the quality and function of the Eden, Derwent and Kent SSSI/SAC catchments. This partnership functions by working with the River Trusts (Eden, West Cumbria and South Cumbria respectively) who plan and deliver these projects in their respective catchments. Most of the rivers within these catchments are designated as Sites of Special Scientific Interest (SSSI) and Special Areas of Conservation (SAC). These are recognised as being the best examples of this type of river throughout Europe for the river habitat and the species they support. Because of their importance for conservation, they are designated as Protected Areas under WFD. WFD requires ‘Measures’ to be put in place to deliver ‘favourable condition’ for each Protected Area. Favourable condition includes restoring near natural processes to the river which includes flow and sediment transport.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information