Case study:Bourne End Recreation Ground River Enhancement Project

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 34' 31.53" N, 0° 42' 20.83" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology, Social benefits, Urban
Country England
Main contact forename Allen
Main contact surname Beechey
Main contact user ID User:ChilternChalkStreams
Contact organisation Chilterns Chalk Streams Project
Contact organisation web site http://www.chilternsaonb.org/chalk-streams
Partner organisations Chiltern Rangers, Revive the Wye, Environment Agency, Wooburn Gree & Bourne End Parish Council, Foundation for Water Research
Parent multi-site project
This is a parent project
encompassing the following
projects
No
View of completed works, 17th Feb 2016

Project summary

Edit project overview to modify the project summary.


The purpose of the Project was to enhance river habitat along a 150m stretch of the R. Wye that borders Bourne End Recreation Ground in Buckinghamshire. Through a combination of tree management work and the installation of Woody Habitat structures, the scheme narrowed the previously over-wide channel and increased heterogeneity of flow and habitat. The scheme was designed to directly contribute to the R. Wye achieving Good Ecological Status under the Water Framework Directive. This project was one of three habitat enhancement Projects completed on the river in 2016 supported by the Catchment Partnership Action Fund. The Project was managed by the Chilterns Chalk Streams Project (CCSP) working in partnership with the Chiltern Rangers CIC, Environment Agency, Wooburn Green & Bourne End Parish Council under the banner of Revive the Wye a local community initiative. The work as carried out using a combination of specialist contractors (tree work) and volunteers. The project was funded by the CCSP, the Catchment Partnership Action Fund and the Chiltern Rangers CIC.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Fixed point photography before, during & after the works. Monthly riverfly monitoring - Anglers Riverfly Monitoring Initiative (commenced September 2015)

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information