Case study:Wensum River Restoration and Floodplain Enhancement, Pensthorpe
Project overview
Status | In progress |
---|---|
Project web site | http://www.environment-agency.gov.uk/homeandleisure/wildlife/114676.aspx |
Themes | Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Robin |
Main contact surname | Chase |
Main contact user ID | |
Contact organisation | Pensthorpe Conservation Trust |
Contact organisation web site | http://www.pensthorpetrust.org.uk/ |
Partner organisations | The Environment Agency, Norfolk Rivers Trust, Natural England, Norfolk Rivers Internal Drainage Board |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The unfavourable ecological condition of the River Wensum SSSI/SAC has arisen over the years through a series of adverse modifications in hydromorphology of the River Wensum, leading to failure of Waterbody GB105034055881 to achieve ‘Good Ecological Potential’ under the WFD. Diffuse water pollution to River Wensum from both agricul-ture and urban sources and disconnection of the River Wensum from its floodplain have also led to consequent eco-logical impoverishment of the floodplain.
The River Wensum and Floodplain Restoration Project is therefore designed to implement restoration measures to restore the form and function typical of a Norfolk Chalk River (e.g. channel narrowing, restoring gravel beds, in-creasing sinuosity, increasing woody debris). This will Improve fisheries, invertebrates and plant communities within the SSSI and SAC and restore the connectivity of the floodplain and floodplain wetland habitats; including the restoration and creation of reedbed and fen habitats. Water quality of urban run-off from Fakenham and adjacent agricultural land will also be improved before reaching the river.
Significant and measureable improvements in habitat for designated features of the River Wensum SSSI/SAC (as identified in the River Wensum Restoration Strat-egy) are key objectives of the project.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Great Ryburgh End Restoration Scheme, Meander reinstatement on the River Wensum at the Ryburgh Loop, River Wensum Restoration, Reach 10 Lenwade, River Wensum Restoration, Reach 3a Costessey, River Wensum Restoration, Reach 9 Attlebridge, River rehabilitation on the River Wensum at Swanton Morley, Sculthorpe Moor Restoration Scheme, Wensum River Restoration and Floodplain Enhancement
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|